AT: Metering Device
English
Deutsch
Request installation of a meter. The installation of a meter must take place within 3 working days (standard load profile) or 8 working days (load profile meter) after the completion of the registration.
Guidance
- Какво трябва да предостави инициаторът
Address
- Резултат
Smart Meter Installed
- Оставащи пречки
In the past there have been delays due to a shortage of devices.