Once the plant is installed, it is crucial to verify that it has been installed correctly. Assess whether the plant operates safely.

Find professional supervision for the construction of the PV plant. Costs are estimated at 1.5% of the total investment. Get the permission to start operation.

Предлага се от
HEP Elektra d.o.o.
Какво трябва да предостави инициаторът

Obtaining a certificate from HEP ODS for the developed main design and other certificates

Резултат

PV plant operating permit; The plant is correctly installed, operates safely and meets all legal requirements.

Оставащи пречки

Insufficient capabilities of HEP Elektra; the speed of finalization depends on the individual Elektra.