BG 21-1: Commissioning - PV systems, direct connection lines, battery storage devices
English
български
Conduct a thorough inspection to ensure that all components of the PV plant are properly installed and it operates safely. Confirm that all safety protocols are in place. Accept the take-over certificate from the engineer.
After equipping the existing connection and building direct connection lines, electricity battery storage devices and SMART GRID automatic control system, the CEP/EC energy installations are put into permanent operation
- Ce que le porteur de projet doit fournir
Approved construction documentation, construction contract, financing.
- Résultat
Grid connection, direct connection lines, electricity storage devices and SMART GRID automatic control system within the CEP/EC completed and operational.