For systems up to 250 kW, the feed-in capacity can be temporarily or generally reduced to an agreed maximum value to guarantee safe and efficient operation of the grid. The limitation may not exceed 1% of the maximum capacity at the grid connection point.

Find how much feed-in the grid can handle. If the grid infrastructure is limited, your feed-in power may be restricted.

Pruža
Energy Netze Steiermark
Što inicijator treba dostaviti

Smart meter's ID (aka Measurement Point)

Rezultat

Max available feed in power

Preostale prepreke

Some regions only allow a small feed in power