HR-23-Commissioning - Plant
English
Hrvatski
Once the plant is installed, it is crucial to verify that it has been installed correctly. Assess whether the plant operates safely.
Find professional supervision for the construction of the PV plant. Costs are estimated at 1.5% of the total investment. Get the permission to start operation.
- Pruža
- HEP Elektra d.o.o.
- Što inicijator treba dostaviti
Obtaining a certificate from HEP ODS for the developed main design and other certificates
- Rezultat
PV plant operating permit; The plant is correctly installed, operates safely and meets all legal requirements.
- Preostale prepreke
Insufficient capabilities of HEP Elektra; the speed of finalization depends on the individual Elektra.