Grid operators cannot deny Systems <= 20 kW from being connected to the grid. A feed-in capacity is guaranteed up to the extent of the already agreed consumption capacity.

Request an approval from power grid operator for your PV plant.

Ce que le porteur de projet doit fournir

Peak power production in kWp; Name and address; site plan; Desired start date for feed-in; Maximum capacity of the system in kW; Number and location of meter points; Type of system and operation

Résultat

Grid access contract

Obstacles restants

The grid operator can limit the feed-in