Planiranje
16 koraka
104
Izgradnja zajednice
Postavite temelje svoje zajednice
Social 7 usluga
▼
BG 01: Community building
Create an initiative committee by experienced individuals. Organize a steering committee with a project coordinator. Engage local individuals interested in PV and CEPs. Introduce and promote the CEP to local authorities.
HR-01-Izgradnja zajednice
Okupite motivirane osobe koje žele sudjelovati u zajednici. Među njima pronađite članove upravljačkog odbora koji će donositi odluke tijekom planiranja.
FR-01-Forming a pilot group
Launching a photovoltaic community energy project is complex and requires good information at the very start. It is better to form a small team of motivated people. The website photovoltaique.info is the reference source of information.
FR-03-Getting approval to launch the project
To launch a photovoltaic community energy project within a condominium, you are advised to get approval by other people in your community, such as the council board of your condominium or the General Assembly.
IT-Expression of interest in joining a REC
Inform the community about the creation of the REC in the municipality by publishing the notice of expression of interest and collecting memberships.
IT-Identification of REC initiators
Gather motivated individuals/PMI/local authorities who want to participate in a REC.
IT-Identification of existing RECs
Joining an already established REC can significantly simplify the process compared to creating a new one. Existing communities have usually already completed the main administrative, legal, and technical steps required to operate.
105
Procjena zajednice
Upoznajte svoju zajednicu.
Social 3 usluge
▼
BG 02: Community assessment
Evaluate the purpose of the E.C. and its size to measure its potential impact. Identify the members of the community to understand its composition. Potential future members have to be considered as well.
HR-02-Procjena zajednice
Razumijevanje dinamike vaše zajednice uključuje procjenu nekoliko ključnih aspekata. Najprije procijenite svrhu zajednice i njezinu veličinu kako biste odredili njezin ukupni doseg i mogući učinak.
IT-Community Assessment
To start your own REC, it is important to begin with a project idea, identifying a first group of promoters, the operational perimeter of the REC, the renewable sources to be used, and the general consumption/production profile.
106
Vrijednosna ponuda
Definirajte svrhu i viziju osnivanja zajednice.
Social 4 usluge
▼
BG 03: CEP Purpose and Vision Proposition
Definition of the purpose and vision of the CEP, including the outcomes, the overall benefit, and how the members will benefit from it. This very initial step makes sure that all participants share the same values and are on one page regarding the project concept.
HR-03-Vrijednosna ponuda
Početna vizija projekta treba jasno opisati njegove glavne ciljeve i težnje. Razmotrite moguće ishode projekta kako biste definirali kriterije uspjeha i učinak.
FR-04-Defining your value proposition
Once your building potential for photovoltaics has been studied, you have to choose how you wish to value your electricity, and you have to plan the works to make your roof PV-ready. Several models of energy may take place in Paris.
IT-Value proposition
The initial vision of your project should clearly outline its overarching goals and aspirations. Consider the potential outcomes of the project to define its success criteria and impact.
110
Dozvola - Zaštita okoliša
Podnesite zahtjev za okolišnu dozvolu.
PV Plant 4 usluge
▼
BG 04: Environmental feasibility check
Check with normative base and local environmental institution (RIEW) whether the implementation of roof-top and stand-alone PV installation up to a certain plant size require an environmental impact assessment. The environmental assessment is necessary if your plant size exceeds 30 MW or if PV plant is freestanding object.
HR-04-1-Dozvola - Zaštita okoliša
Je li potrebna procjena utjecaja na okoliš ovisi o značajkama vašeg projekta. U pravilu je procjena potrebna ako snaga elektrane prelazi 10 MW i ako je fotonaponska elektrana samostojeći objekt.
HR-04-2-Zahtjev za dozvolu - Zaštita okoliša
Je li potrebna procjena utjecaja na okoliš ovisi o značajkama vašeg projekta. Procjena je potrebna ako snaga elektrane prelazi 10 MW i ako je fotonaponska elektrana samostojeći objekt.
IT-Application for environmental permit
Determining whether an environmental assessment is required depends on the specifics of your project. Generally, an assessment is necessary if the plant size exceeds certain thresholds set by regulatory agencies.
115
Dozvola - Prostorno uređenje
Podnesite zahtjev za dozvolu.
PV Plant 6 usluga
▼
BG 06: Documentation and Approval - Technical projects
Prepare technical documentation for the PV plant/EC to apply for different permits, including: building permit, grid connection permit, etc.
HR-05-1-Dozvola - Propisi o prostornom uređenju
Pri planiranju fotonaponske instalacije važno je uzeti u obzir ograničenja u pogledu izgleda zgrade. Za neka područja postoje estetske smjernice ili građevinski propisi koji ograničavaju promjene vanjskog izgleda zgrade.
HR-05-2-Zahtjev za dozvolu - Propisi o prostornom uređenju
Pri planiranju fotonaponske instalacije važno je uzeti u obzir ograničenja u pogledu izgleda zgrade. Za neka područja postoje estetske smjernice ili građevinski propisi koji ograničavaju promjene vanjskog izgleda zgrade.
FR-09-Getting permit - Urbanism and heritage protection
A permit is needed from the local authority, Paris City administration, according to urbanism and heritage protection rules. Your PV plant will be located on rooftops in most cases and may cause changes in the aspect of your building.
FR-09-Getting permit - Focus on heritage protection
PV plant in Paris will be located on rooftops in most cases. Such PV plant changes the aspect of a building. It has to be authorized according to urbanism and heritage protection rules.
IT-Analysis of Heritage, Environmental and Spatial Planning Constraints
When planning a photovoltaic (PV) installation within a Renewable Energy Community (REC), it is essential to assess all regulatory and environmental constraints affecting the project site.
120
Analiza - Statika
Istražite konstrukcijske preduvjete za svoju fotonaponsku instalaciju.
PV Plant 5 usluga
▼
AT: Analysis - Structural
If a structural analysis is required, then it must include the following: For a new building: Proof of the load-bearing capacity, usability, and durability of the load-bearing structure in accordance with OIB-RL 1. For the subsequent installation of a PV system: Survey of the existing structure, at least to Level 1, in accordance with the guidelines of OIB-RL 1; Proof of the minimal impact of the measure (load increase <= 3%) OR Proof of the load-bearing capacity, usability, and durability of…
BG 07: Analysis - Load bearing capacity for installation of PV systems
Determine whether the roof structure can bear additional load of PV installation and how big the load can be.
HR-06-Analiza - Statika
Prije ugradnje fotonaponskog sustava ključno je procijeniti kvalitetu, konstrukciju i stanje krova kako biste bili sigurni da može nositi instalaciju.
FR-04-Studying the feasibility of the project - PV-ready building
Implementing a PV plant on your roof requires your building to be PV-ready in terms of: load bearing capacity; water-proofing; human accessibility; accessibility for PV panels; among other aspects.
IT-Roof Area and Structural Analysis
Before installing a photovoltaic (PV) system within a Renewable Energy Community (REC), it is essential to assess both the available roof surface and the structural capacity of the building.
121
Dozvola - Građevinski propisi
Podnesite zahtjev za dozvolu.
PV Plant 4 usluge
▼
AT: Permit - Building Code
Some PV installations need building notification (Bausanzeige), some need building permit (Baubewilligung) some need none. In any case, compliance with fire protection, glare, and structural integrity is required.
BG 05: Preliminary building permit for PV plants and direct power lines in urban environments
Obtain authorization by local authorities in order to construct PV plant and direct power lines.
HR-07-Dozvola - Građevinski propisi
Da bi se uopće mogla započeti izgradnja sunčane elektrane, sva građevinska i vlasnička dokumentacija mora biti ažurna i u skladu sa zakonom.
IT-Authorisation for PV plants in existing buildings and on the ground on the SUER platform
The service supports the user to join the SUER Platform (helpdesk for renewable energies) and provides the single model for permit for integrated PV plants systems in existing buildings.
130
Analiza - Električne instalacije
Istražite postojeće instalacije u objektu.
PV Plant 6 usluga
▼
BG 08-1: Analysis - Connection to the power grid for self consumption
Identify the nearest connection point to the grid with the DSO and check whether there are possibilities for augmentation of the feed in power. Check if there are any limitations on feed-in power, as well as the hardware requirements for connecting the PV system to the grid.
BG 08-2: Analysis - Power distribution cabinets
Assessment whether the existing power cabinets that service the building are sufficient to handle the current of the PV plant. Determine the ownership of power cabinets.
HR-08-1-Analiza - Električne instalacije
Prije fotonaponske instalacije nužno je procijeniti je li nazivna snaga postojećih instalacija u zgradi dovoljna za struju vaše fotonaponske elektrane.
HR-08-2-Analiza - Brojila i razdjelni ormari
Mnoga kućanstva u Hrvatskoj imaju stara brojila električne energije. Nova brojila mogu se očitavati na daljinu. U mnogim kućama brojila i razdjelni ormari nalaze se unutar stana.
FR-02-Analysing opportunity 4-Wiring
The goal of this step is to anticipate possible works of adaptation of your building wiring infrastructure to a future PV plant. The wiring infrastructure in your building connects the public grid to each of the private apartment and each of the collective equipments.
IT-Establishment of PV electrical connections and wiring assessment
Before proceeding with a PV installation within a Renewable Energy Community (REC), it is essential to assess the existing electrical infrastructure and its compatibility with the planned system.
135
Analiza - Elektroenergetska mreža
Istražite preduvjete za priključenje fotonaponske elektrane na mrežu.
PV Plant 15 usluga
▼
AT: Analysis - Max Feed-In Steiermark
For systems up to 250 kW, the feed-in capacity can be temporarily or generally reduced to an agreed maximum value to guarantee safe and efficient operation of the grid. The limitation may not exceed 1% of the maximum capacity at the grid connection point.
AT: Analysis - Free capacity per substation
Understand if the substation still has free capacity. Available or booked capacities per substation (network level 4) are published quarterly.
AT: Permit - Grid Connection
Grid operators cannot deny Systems <= 20 kW from being connected to the grid. A feed-in capacity is guaranteed up to the extent of the already agreed consumption capacity.
AT: Analysis - Grid Connection Costs
Pay grid provision fee (Netzbereitstellung) and the grid access fee (Netzzutrittsentgelt). The distribution system operator has 2 weeks (network level 7) or 1 month (network levels 1 to 6) from the receipt of a request to provide a cost estimate.
BG 09-2: Analysis - Free capacity of the feeder/low voltage grid connection line
Obtain information of the DSO free grid capacity to assess whether it will be possible to sell surplus energy to the electricity market.
BG 09-1: Analysis - Additional grid connections
For a CEP/EC with several buildings included and several direct power lines between the participants more than one grid connections with different characteristics maybe explored.
BG 09-3: Obtaining a Permit for connection to the grid
To build a PV plant first of all is necessary to obtain preliminary permit by the DSO, stating that connection to the grid in the area is possible and is generally available.
HR-09-Analiza - Elektroenergetska mreža
Pri planiranju fotonaponske instalacije važno je utvrditi najbližu točku priključenja na mrežu kako biste odredili kako će se sustav uklopiti u postojeću infrastrukturu.
FR-10-Requiring connection to the grid
Connection to the grid is required for any PV plant. You have to go through a standard procedure with your DSO, Enedis in Paris.
FR-10-Simulating connection to the grid
Connecting to the grid is a key step. It is important to simulate and anticipate before you actually demand connection. You have to pay attention to assessing the need for renovation of your building electric wiring and meters.
FR-10-Getting a Proposition for grid connection
Once you have completed your demand for grid connection (DCR), you will receive within a defined timeframe a Proposition with a price to pay for connecting to the grid (PTF or PDR) that you will have to accept to launch construction work.
IT-Identification of Point of delivery
It is important to know the POD (Point of Delivery) in Renewable Energy Communities (RECs) because it uniquely identifies each electricity user within the grid.
IT-Mapping of primary substations
The interactive map of the primary substations helps developers of energy communities to identify grid connection area of the same primary electrical substation.
IT-Identification of critical areas
It is necessary to assess the capacity of the local electrical grid to accommodate the power generated and fed into the grid. DSOs have prepared maps of critical areas defined by color (Red high criticality, Orange medium, Yellow low, White very low).
IT-Permit: grid connection
When planning a PV installation, it is important to identify the nearest connection point to the grid. Check if there are any limitations on feed-in power. Review the hardware requirements for connecting your PV system to the grid.
150
Analiza - Građevinske sinergije
Razmislite o građevinskim radovima koji se mogu izvesti usporedno s ugradnjom fotonaponske elektrane.
Social 2 usluge
▼
HR-10-Analiza - Građevinske sinergije i zaštita od požara
Pri ugradnji fotonaponske elektrane korisno je razmotriti građevinske radove koji se mogu izvesti istodobno kako bi se povećala učinkovitost i smanjile smetnje.
FR-02-Analysing opportunity - PV project within a holistic approach
Planning works on your roof for the implementation of a PV plant is an opportunity to consider the building as a whole. You are advised to investigate the need for works in all technical dimensions, structural, architectural and environmental.
160
Analiza - Potrošnja
Upoznajte svoje potrebe za električnom energijom
PV Plant 7 usluga
▼
AT: Analysis - Consumption
Determine the annual consumption. Your annual electricity demand is stated on your utility bill. You also find it on the web portal of your electricity provider and/or grid operator.
AT: Analysis Consumption Profile
Electricity consumption can be estimated based on old electricity bills. Alternatively, smart meters can be read via the service portal of the grid operator. These time series provide insight into the dynamics of electricity consumption.
BG 10: Analysis - Consumption Profile
Find the consumption profile of the daily/monthly/annual routine of the EC buildings for the last three years.
HR-11-Analiza - Potrošnja
Razumijevanje vlastitih energetskih potreba ključno je za optimizaciju fotonaponske instalacije. Započnite procjenom dnevne, mjesečne i godišnje potrošnje.
FR-02-Analysing opportunity 2-Consumption
Once you have estimated your potential for production, you have to question which use you will make of the electricity generated. Knowing your building or community consumption will give you an insight into the share of electricity generated that may be consumed.
FR-02-Getting consumption data
In order to analyse precisely the potential for self-consumption, it is useful to get first the actual consumption data of the buildings within the community. Enedis provides a free service called dataconsoelec.
IT-Analysis - Consumption
Understanding your energy needs is crucial for optimizing a PV installation. Start by assessing your daily, monthly, and annual consumption to determine the system size required to meet your energy demands.
170
Ugovor o otkupu
Pronađite nekoga tko će kupiti vaš višak električne energije.
PV Plant 6 usluga
▼
AT: Analysis - Feed-in tariffs
Compare various prices for excess solar electricity, summarized on pvaustria.at
BG 11: Contract - Sale of excess electric energy to the market
Identifying, contacting and negotiating favorable off-take terms with consumers in the vicinity of the EC. Provide expert knowledge to EC for understanding and finding a suitable contractual partner.
HR-12-Ugovor o otkupu
Prije uključivanja fotonaponskog sustava provjerite ispunjavate li uvjete za status opskrbljivača električnom energijom, jer taj status određuje možete li višak energije prodavati mreži ili drugim članovima energetske zajednice.
FR-12-Contracting purchase contract
You can contract a purchase contract if you choose to sell part or totality of your electricity. Either you sell it within a collective self-consumption operation (CSC) or to an independent buyer (PPA), or to an obliged buyer for 20 years.
IT-Contract - sale of excess electricity to GSE
The Ritiro Dedicato consists of the transfer to GSE of the electricity fed into the grid from photovoltaic systems. The GSE pays the producer a specific price for each kWh injected into the grid.
IT-Contract for sale of excess of electricity to the market
It consists of selling the excess of electricity fed into the grid from PV systems on the market.
180
Analiza - Prinos
Kolika je moja fotonaponska elektrana i koliko proizvodi?
PV Plant 7 usluga
▼
AT: Analysis - Solar Radiation and Electricity yield
1) Determine the Annual Solar Radiation for your address (in kWh/m2/a). 2) Multiply with your plant size (in m2) and efficiency (kWelectric / kWradiation)
BG 12-1: Analysis - Roof areas, solar radiation and electricity yield profile
Evaluate the available area for panel placement, determine how much photovoltaic capacity can be accommodated, assess the possible solar yield at the EC location. Recommend high efficiency PV panels.
BG 12-2: Analysis - Size of PV installations, electricity storages, direct power lines
This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages, direct power lines and power grid connections.
HR-13-Analiza - Prinos
Pri planiranju fotonaponske instalacije započnite procjenom raspoložive površine za postavljanje panela kako biste utvrdili koliko se fotonaponske snage može smjestiti.
FR-02-Analysing opportunity 1-Production
Estimating the production available on your building roof is probably the first step. It depends on many factors such as the surface of the roof available for PV panels, the energy it receives from the sun, its inclination and orientation.
FR-04-Studying the feasibility of the project
Once your project is launched and approved, it is necessary to have Professionals study the feasibility of your project. Feasibility study will give you a more precise simulation of production potential.
IT-Analysis - Solar Radiation and Electricity yield
This step aims to estimate the expected electricity production of the photovoltaic (PV) system based on local solar radiation conditions. The analysis includes: Determining the annual solar irradiation at the project location; Estimating the electricity yield.
190
Analiza - Ekonomičnost
Izračunajte troškove i prihode svoje fotonaponske elektrane.
PV Plant 8 usluga
▼
AT: Analysis Economical
Use the calculation tool
AT: Analysis - Tax
Anyone who operates a photovoltaic system must consider Austrian tax law. The revenue from electricity sales and/or the use of self-generated electricity for private purposes creates an income tax obligation. Additionally, the question of VAT liability must be clarified.
BG 14-1: Analysis - Self energy consumption by CEP/EC participants
Use real and prognosis data for the last 3 years to match the electricity yield with the consumption profile of each of the CEP/EC participants.
BG 14-2: Key elements of economic and financial analysis and business plan
Evaluate the PV system to determine how much of the generated electricity can be used by the members of the EC and how much can be sold. Develop a business plan and a cash-flow analysis.
BG 14-3: Estimate - Costs
Estimate the costs related to the building of the PV installation, electricity battery storages, direct power lines between installations of participants in the CEPs/ECs.
HR-14-Analiza - Ekonomičnost
Pri procjeni fotonaponskog sustava utvrdite koliko proizvedene električne energije možete sami iskoristiti, a koliko se može prodati ili ustupiti drugima.
FR-02-Analysing opportunity 3-Economics
Once you have estimated potential for production and self-consumption of electricity, you have to know how much it should cost and how much you should benefit from it. The preassessment of economic balance gives you an estimation of the return on investment.
IT-Preliminary Energy and Economic assessment
Use SHARE - Simulator for Holistic energy-economic Assessment for Renewable Energy Communities, the calculation tool for economic and financial assessment, developed internally by AGENA.
191
Prethodna procjena - Financiranje
Napravite početnu procjenu mogućnosti financiranja
PV Plant 2 usluge
▼
BG 13: Financial concept
The feasibility of the technical solution is very much dependent on the possibility to finance the endeavor. Financial possibilities shall be assessed, consisting of own funding (equity), public funding and subsidies, as well as third party funding.
HR-15-Prethodna procjena - Financiranje
Izvedivost fotonaponske instalacije uvelike ovisi o mogućnosti financiranja pothvata.
193
Analiza - Fotonaponski sustav
Upoznajte sve komponente svoje fotonaponske elektrane
PV Plant 2 usluge
▼
HR-16-Analiza - Fotonaponski sustav - Dokumentacija i odobrenje - Glavni projekt
Izradite tehnički opis, grafički prikaz ili idejno rješenje. Dokumentacija treba sadržavati: elektrotehnički projekt, građevinski projekt, statički proračun krova i arhitektonski projekt.
IT-Analysis - Size of PV installations and electricity storages
This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages. The objective is to balance energy production and consumption in order to maximize self-consumption and shared energy within the REC.
2
Realizacija
10 koraka
205
Osiguranje
Pronađite osiguravatelja.
PV Plant 5 usluga
▼
AT: Insurance
Find insurance. Covers damage from hail, storms, lightning strikes, and fire. Many building insurances already include coverage. Consider separate insurance for off roof installations. Typical costs: 2 EUR per kWp
BG 15: Insurance
The planning of the PV system requires to understand all risks and costs associated with insurance. It is crucial to be adequately covered for potential issues such as equipment damage, theft, or liability.
HR-17-Osiguranje
Pri planiranju fotonaponskog sustava važno je razumjeti rizike i troškove osiguranja. Polica osiguranja iznosi 0,5 % ukupnog iznosa ulaganja godišnje.
FR-07-Getting insurance
Once you have validated quotes for installation works, you need to check three types of insurance. Two are mandatory (installer insured for the systems; you as an electricity producer must contract a liability insurance) and one is optional.
IT-Insurance
This step aims to identify and secure appropriate insurance coverage for photovoltaic (PV) systems and the activities of the Renewable Energy Community (REC). Key risks: damage to PV equipment, theft, business interruption, third-party liability.
210
Uloge u zajednici
Definirajte osnovni tim i njegove odgovornosti.
Social 4 usluge
▼
BG 16: Consulting EC roles
General consulting depending on the objectives of the CEP/EC, including organizational structure, workload and responsibility distribution and management structures.
HR-18-Uloge u zajednici
Iako su ključni članovi određeni u fazi razvoja, te uloge treba preispitati u fazi realizacije i razmotriti dodatne uloge.
FR-05-Defining community roles
For the development, implementation and exploitation of a PV plant and energy community, it is crucial to define roles. You can choose between different approaches: rely on community members, externalize chosen works, or externalize as many works as possible.
IT-Appointment of REC representative
The REC must appoint a representative (soggetto referente) responsible for managing relations with the GSE and handling operational and administrative obligations.
220
Financiranje - Privatni kapital
Osigurajte financiranje i pribavite vanjski kapital.
PV Plant 5 usluga
▼
AT: Financing - Crowd Financing
Apply for a crowd financing scheme with GeReGi.
BG 17: Co-financing mechanisms with ESCOs/Private Banks/Crowdfunding
There are three potential ways to privately co-fund an EC project - getting a loan from a private bank, gathering resources from different investors in the form of crowdfunding and/or attracting one bigger investor in the form of an ESCO.
HR-19-Financiranje - Privatni kapital
Za financiranje projekta razmotrite tri glavne mogućnosti: bankovni kredit, pronalazak ulagača i skupno financiranje (crowdfunding).
FR-08-Getting a collective loan
Financing a PV installation in a condominium or community may require to contract a loan. Certain banks offer collective loans with low or zero rates, such as Eco Prets a Taux Zero (EcoPTZ) for collective housing.
IT-Access to private capital
This step defines the financing strategy for the implementation of photovoltaic (PV) systems and related infrastructure within a Renewable Energy Community (REC). Several financing models: Own resources; Bank loans; ESCO models; Public-private partnerships.
231
Financiranje - Javna sredstva
Osigurajte financiranje i pribavite vanjski kapital.
PV Plant 8 usluga
▼
AT: Financing - Grant
The EAG grants investment subsidies, for which project proposals must be submitted to ongoing funding programs. The amount of the investment subsidy is limited to a maximum of 30% of the investment volume directly required for the construction of the system.
BG 18: Public co-financing for ECs
The public financing will guarantee the overall economic feasibility of the projects and thus support the involvement of private fund in the co-financing structure.
HR-20-Financiranje - Javna sredstva
Da biste osigurali dodatna sredstva za projekt, razmotrite prijavu za bespovratna sredstva i državne kredite.
FR-08-Accessing public aids
Access to finance is a challenge. Collective decision within condominium councils is generally facilitated if return on investment is made after less than 10 years, and all the more if the initial investment is lowered thanks to public aids.
IT-Access to the capital contribution - NRRP measure
This step concerns access to capital grants provided under the National Recovery and Resilience Plan (NRRP) to support the deployment of renewable energy systems within RECs located in municipalities with fewer than 50,000 inhabitants.
IT-Capital grant for citizens beneficiaries national energy income
This step identifies some of the options available to an REC for the implementation of systems for the production of energy from renewable sources. It is a capital grant aimed at the installation of domestic PV systems (from 2 kW to 6 kW), serving residential properties owned by households in economic hardship.
IT-Access to financial contributions
This step identifies financial contributions available. The financial contributions are granted for a period of 20 years. The eligible contributions are: Enhancement of self-consumed electricity; Incentivization (premium tariff) of shared electricity; Compensation for the withdrawal of electricity fed into the grid.
IT-Support for the investments - Bonus casa for citizens
Ten-year tax deduction for the installation of photovoltaic systems up to 200kW and energy storage systems, equal to 50% of the expenses incurred for the primary residence, with a spending cap of 96,000 euro per property unit.
242
Nabava - Oprema
Pokrenite postupak nabave i kupite opremu
PV Plant 4 usluge
▼
AT: Enquire binding offer for plant construction
Provide pre-planning documents, scope of equipment, information about location, address, restrictions, information about building, roof, electrical installations and related locations including pictures, provide grid access confirmation document.
BG 19: Construction - Installing PV System, direct connection lines, battery storage devices
Specify requirements for the PV installation/battery storage solutions detailing the technical and functional needs of the desired equipment, including any performance criteria or standards.
HR-21-Nabava - Oprema
Za uspješnu nabavu započnite jasnim definiranjem svojih zahtjeva.
IT-Procurement procedures for PV systems for public bodies
If you are a public body, you can simplify the procedures for purchasing and installing photovoltaic systems directly on MePA (Electronic Market of Public Administration).
245
Nabava - Stručnjaci
Pronađite i angažirajte pružatelje usluga i tehničare za ugradnju fotonaponske elektrane
PV Plant 3 usluge
▼
BG 20: Professional expertise
This step consists in finding engineers and technicians for the installation of the PV plant. It involves the evaluation of qualified and recommended professionals.
HR-22-Nabava - Stručnjaci
Za uspješnu realizaciju projekta započnite jasnim predstavljanjem njegovih značajki potencijalnim stručnjacima.
FR-06-Choosing an installer
An installer must be certified by the State as RGE (Reconnu Garant de l'Environnement). Certification is mandatory to access public aids. An installer must be qualified for the right category of work.
250
Puštanje u pogon - Elektrana
Ishodite dopuštenje za početak rada
PV Plant 9 usluga
▼
AT: Metering Device
Request installation of a meter. The installation of a meter must take place within 3 working days (standard load profile) or 8 working days (load profile meter) after the completion of the registration.
AT: Norms and Standards
Ensure that the system complies with the norms and standards
BG 21-1: Commissioning - PV systems, direct connection lines, battery storage devices
Conduct a thorough inspection to ensure that all components of the PV plant are properly installed and it operates safely. Confirm that all safety protocols are in place. Accept the take-over certificate from the engineer.
BG 21-2: Construction - SMART GRID automatic management system
Identifying an AI enabled SMART GRID system for fully automated control of all energy installations within the CEP/EC.
HR-23-Puštanje u pogon - Elektrana
Nakon ugradnje elektrane ključno je provjeriti je li pravilno ugrađena. Procijenite radi li elektrana sigurno.
FR-11-Putting the plant into service
Once you have accepted the Proposition (PTF or PDR), you can proceed to the building of the plant. Then you will have to commission the plant to ensure it is perfectly secure. Consuel is the mandated organism for commissioning.
IT-Registration on GAUDI portal
The registration of a photovoltaic system on Gaudi Terna is a fundamental and binding step for connecting the photovoltaic system to the national electricity grid. Without a valid registration on the Gaudi portal, it is not possible to connect your photovoltaic system to the national grid.
IT-Commissioning PV system
After getting the permission to start operation, the installer has to install the plant correctly, check if it operates safely and meets all regulatory requirements.
IT-Norms and Standards
Ensure that the plant and the overall Renewable Energy Community (REC) system are designed, installed, and commissioned in compliance with all applicable technical standards, safety regulations, and grid connection requirements.
260
Osnivanje pravne osobe
Osnujte svoju zajednicu obnovljive energije kao pravnu osobu.
REC 5 usluga
▼
AT: Legal Entity
An energy community needs to become a legal entity. The cheapest option is to establish a society (Verein) at the local authority: District Commission (Bezirkshauptmannschaft) or Regional Police Directorate (Landespolizeidirektion)
BG 22: Legal entity consulting
Review of national regulations for the establishment of a legal entity to set up the REC or operate a CEP, including rules of procedures, limitations and possible (dis)advantages.
HR-24-Osnivanje pravne osobe
Za osnivanje zajednice obnovljive energije (ZOE) ili zajednice građanske energije (ZGE) u Hrvatskoj morate osnovati neprofitnu udrugu.
FR-13-Establishing legal entity for collective self-consumption
A legal entity gathering producers and consumers that will exchange energy among themselves is mandatory in the French law. It is called a Moral Organizing Persona (PMO in French).
IT-Definition and Establishment of the Legal Entity
A Renewable Energy Community must be established as an independent legal entity. This step includes both the selection of the most suitable legal model and the formal establishment of the entity.
270
Registracija - Tržište
Registrirajte svoju zajednicu radi sudjelovanja u procesima tržišta električne energije.
REC 7 usluga
▼
AT: Registration - Market Participant
ebUtilities.at provides the market partner directory which includes registered market partners. Operators of (future) energy communities need to register on the platform. They will receive a unique Market Partner ID after approximately 2 days.
AT: Registration - Grid Operator
Energy communities need to sign a contract with the grid operator.
AT: Registration - EDA Portal
The EDA Portal is a web platform for energy service providers and energy communities. It provides easy access to energy industry data.
AT: Registration - EC members
With your eda access, you can create a new energy community in your eda portal. Afterwards you can invite others to join your community.
BG 23: Registration as market participant (ESO and SEDA)
To actively participate in electricity market processes, you must register the REC with the electricity system operator (ESO) and the sustainable energy development agency (SEDA) for reporting purposes.
HR-25-Registracija - Tržište
Da biste aktivno sudjelovali na tržištu električne energije, morate registrirati dozvolu za obavljanje energetske djelatnosti koju izdaje HERA.
IT-Registration on GSE portal
Registration with the GSE is required for the official recognition of the REC and access to incentive schemes. At this stage, the REC is configured from both an administrative and technical perspective.
290
Registracija - Porez
Registrirajte svoju zajednicu kod porezne uprave.
REC 7 usluga
▼
AT: Registration - Tax
You will receive mail from the tax authority. Notify them about the commencement of association activities and provide a signature sample.
AT: Registration - VAT Number
For energy communities whose turnover does not exceed 55,000 euros p.a., the tax exemption for small businesses applies. These entrepreneurs do not need to pay VAT to the tax office; however, they are not allowed to show VAT on invoices they issue.
BG 24: Registration with the National Revenue Agency
Registration of the legal entity of the REC with the National Revenue Agency of Bulgaria for tax purposes. Once registered, you will receive a tax verification number.
HR-26-Registracija - Porez
U Hrvatskoj je ZOE ili ZGE moguće registrirati samo kao udrugu - neprofitnu organizaciju. Nakon registracije dobit ćete porezni identifikacijski broj.
IT-Registration on the business registry
Depending on the chosen legal form, the REC may be required to register in the Business Register (Registro delle Imprese) at the competent Chamber of Commerce.
IT-Tax Registration
Once established as a legal entity, the REC must be registered with the Revenue Agency to obtain a tax identification code and, if required, a VAT number.
IT-Plant Registration with Customs and Monopolies Agency
This step involves the formal registration of an electricity generation plant with the Agenzia delle Dogane e dei Monopoli (ADM). Plants with capacity above 20 kW must be registered as electric workshops (officine elettriche).
3
Upravljanje
5 koraka
320
Održavanje - Oprema
Redovito održavanje i popravci fotonaponske elektrane.
PV Plant 4 usluge
▼
BG 25: Maintenance of HW
Ensure the regular maintenance and repairs of the PV plant and other energy installations of the CEP/EC.
HR-27-Održavanje - Oprema
Redovito održavanje i popravci ključni su za učinkovitost i dugovječnost vaše fotonaponske elektrane. Troškovi održavanja iznose oko 0,3 % ulaganja godišnje.
FR-15-Maintenance of your PV plant
Maintenance is necessary to ensure correct functioning. Maintenance can be made by yourself as a producer, by professionals. It is advised to have an annual visual check of your plant.
IT-Maintenance Recommendations
Ensure the proper operation and optimal performance of the REC photovoltaic systems through regular and extraordinary maintenance activities. Average maintenance costs are estimated at 0.5%-1% of the initial investment per year.
330
Članstvo - Administracija
Pristupanje i istupanje članova zajednice obnovljive energije.
REC 4 usluge
▼
BG 26: Membership changes
In order to manage the CEP/EC effectively, report any membership changes to the power grid operator to ensure accurate records. Register new participants in the REC and update the member list.
HR-28-Članstvo - Administracija
Za učinkovito upravljanje energetskom zajednicom prijavljujte sve promjene članstva operatoru mreže kako bi evidencija bila točna.
FR-16-On- and off-boarding of members
Throughout the lifecycle of your project, you may wish to recruit new members, and members may wish to leave the community. Informal at the start, membership will become formal once you have created a legal entity.
IT-Membership changes
In order to manage the REC effectively, report any membership changes to the GSE to ensure accurate records. Register new participants in the REC and update the member list.
350
Obračun
Periodični obračun potrošnje i predaje električne energije u mrežu.
REC 5 usluga
▼
AT: Billing - Monthly invoicing
Energy community operators have access to energy consumption and feed-in data of each member. This data needs to be transposed into an invoice. Invoices need to be send out periodically.
AT: Billing - Price Sheet
Costs for electricity consumption from the energy community need to be adjusted and communicated frequently.
BG 27: Billing
Ensure provision of SMART GRID solutions for metering in real time of energies delivered within the CEP/EC and to/from the grid; clearance of mutual deliveries between the participants and traders, and billing of energy.
HR-29-Obračun
Za učinkovit obračun i periodično poravnanje potrošnje i predaje električne energije započnite prikupljanjem točnih energetskih podataka.
IT-Billing and incentive management
The billing process includes: Metering and data collection from each member's POD; Aggregation and processing of data; Calculation of self-consumed and shared energy; Determination of energy injected or withdrawn from the national grid; Application of incentive mechanisms.
360
Računovodstvo
Knjigovodstvo i izvještavanje prema poreznim tijelima
REC 4 usluge
▼
BG 28: Accounting
Analyse and instruct your accounting expert for the specific requirements for the tax reporting of the energy community.
HR-30-Računovodstvo
Učinkovito računovodstvo i knjigovodstvo uključuju izradu financijskih izvještaja koji daju jasan pregled financijskog stanja projekta.
FR-14-Exploitation of a self-consumption operation
A collective self-consumption operation is heavier to exploit than a mere PV plant. Your implication as a person or community can be more or less important depending on your wishes, availabilities and competencies.
IT-Accounting
Effective accounting includes: Managing day-to-day bookkeeping; Preparing financial statements and reports; Ensuring compliance with all legal and regulatory requirements; Reconciling accounts.
380
Članstvo - Uključenost
Usluge za članove i njihova stalna uključenost.
Social 4 usluge
▼
BG 29: Membership engagement
In order to ensure transparency and accountable management of the CEP/EC their members should be regularly updated with current development, problems and achievements.
HR-31-Članstvo - Uključenost
Da biste održali usluge za članove energetske zajednice i njihovu stalnu uključenost, redovito ih obavještavajte o najnovijim informacijama i događanjima.
FR-17-Membership engagement
Recruiting new consumers and producers is a way for the community to optimize self-consumption rates and inject to the grid the least of surplus possible.
IT-Membership engagement
To maintain CEP member services and continuous engagement, keep members updated with the latest information and developments. Actively recruit new members to expand the community and enhance its impact.