Grid operators cannot deny Systems <= 20 kW from being connected to the grid. A feed-in capacity is guaranteed up to the extent of the already agreed consumption capacity.

Request an approval from power grid operator for your PV plant.

Was der Initiator bereitstellen muss

Peak power production in kWp; Name and address; site plan; Desired start date for feed-in; Maximum capacity of the system in kW; Number and location of meter points; Type of system and operation

Ergebnis

Grid access contract

Verbleibende Hürden

The grid operator can limit the feed-in