1
Planung
16 Schritte
104
Aufbau der Gemeinschaft
Legen Sie das Fundament Ihrer Gemeinschaft
Social 7 Services
▼
BG 01: Community building
Create an initiative committee by experienced individuals. Organize a steering committee with a project coordinator. Engage local individuals interested in PV and CEPs. Introduce and promote the CEP to local authorities.
HR-01-Community Building
Gather motivated individuals who want to participate in the community. Find among them members of the steering committee who will make decisions during the planning process.
FR-01-Forming a pilot group
Launching a photovoltaic community energy project is complex and requires good information at the very start. It is better to form a small team of motivated people. The website photovoltaique.info is the reference source of information.
FR-03-Getting approval to launch the project
To launch a photovoltaic community energy project within a condominium, you are advised to get approval by other people in your community, such as the council board of your condominium or the General Assembly.
IT-Expression of interest in joining a REC
Inform the community about the creation of the REC in the municipality by publishing the notice of expression of interest and collecting memberships.
IT-Identification of REC initiators
Gather motivated individuals/PMI/local authorities who want to participate in a REC.
IT-Identification of existing RECs
Joining an already established REC can significantly simplify the process compared to creating a new one. Existing communities have usually already completed the main administrative, legal, and technical steps required to operate.
105
Analyse der Gemeinschaft
Lernen Sie Ihre Gemeinschaft kennen.
Social 3 Services
▼
BG 02: Community assessment
Evaluate the purpose of the E.C. and its size to measure its potential impact. Identify the members of the community to understand its composition. Potential future members have to be considered as well.
HR-02-Community Assessment
Understanding the dynamics of your community involves assessing several key aspects. First, evaluate the purpose of your community, and its size to gauge its overall reach and potential impact.
IT-Community Assessment
To start your own REC, it is important to begin with a project idea, identifying a first group of promoters, the operational perimeter of the REC, the renewable sources to be used, and the general consumption/production profile.
106
Nutzenversprechen
Legen Sie Zweck und Vision für die Gründung einer Gemeinschaft fest.
Social 4 Services
▼
BG 03: CEP Purpose and Vision Proposition
Definition of the purpose and vision of the CEP, including the outcomes, the overall benefit, and how the members will benefit from it. This very initial step makes sure that all participants share the same values and are on one page regarding the project concept.
HR-03-Value Proposition
The initial vision of your project should clearly outline its overarching goals and aspirations. Consider the potential outcomes of the project to define its success criteria and impact.
FR-04-Defining your value proposition
Once your building potential for photovoltaics has been studied, you have to choose how you wish to value your electricity, and you have to plan the works to make your roof PV-ready. Several models of energy may take place in Paris.
IT-Value proposition
The initial vision of your project should clearly outline its overarching goals and aspirations. Consider the potential outcomes of the project to define its success criteria and impact.
110
Genehmigung - Umwelt
Umweltgenehmigung beantragen.
PV Plant 4 Services
▼
BG 04: Environmental feasibility check
Check with normative base and local environmental institution (RIEW) whether the implementation of roof-top and stand-alone PV installation up to a certain plant size require an environmental impact assessment. The environmental assessment is necessary if your plant size exceeds 30 MW or if PV plant is freestanding object.
HR-04-1-Permit - Environmental
Determining whether an environmental assessment is required depends on the specifics of your project. Generally, an assessment is necessary if the plant size exceeds 10 MW and if PV plant is freestanding object.
HR-04-2-Apply for Permit - Environmental
Determining whether an environmental assessment is required depends on the specifics of your project. An assessment is necessary if the plant size exceeds 10 MW and if PV plant is freestanding object.
IT-Application for environmental permit
Determining whether an environmental assessment is required depends on the specifics of your project. Generally, an assessment is necessary if the plant size exceeds certain thresholds set by regulatory agencies.
115
Genehmigung - Raumordnung
Genehmigung beantragen.
PV Plant 6 Services
▼
BG 06: Documentation and Approval - Technical projects
Prepare technical documentation for the PV plant/EC to apply for different permits, including: building permit, grid connection permit, etc.
HR-05-1-Permit - Spatial Planning Legislation
When planning a PV installation, it is important to consider any limitations regarding the appearance of the building. Some areas have aesthetic guidelines or building codes that restrict changes to a building's exterior.
HR-05-2-Apply for Permit - Spatial Planning Legislation
When planning a PV installation, it is important to consider any limitations regarding the appearance of the building. Some areas have aesthetic guidelines or building codes that restrict changes to a building's exterior.
FR-09-Getting permit - Urbanism and heritage protection
A permit is needed from the local authority, Paris City administration, according to urbanism and heritage protection rules. Your PV plant will be located on rooftops in most cases and may cause changes in the aspect of your building.
FR-09-Getting permit - Focus on heritage protection
PV plant in Paris will be located on rooftops in most cases. Such PV plant changes the aspect of a building. It has to be authorized according to urbanism and heritage protection rules.
IT-Analysis of Heritage, Environmental and Spatial Planning Constraints
When planning a photovoltaic (PV) installation within a Renewable Energy Community (REC), it is essential to assess all regulatory and environmental constraints affecting the project site.
120
Analyse - Statik
Klären Sie die baulichen Voraussetzungen für Ihre PV-Anlage.
PV Plant 5 Services
▼
AT: Analyse - Statik
Ist ein statischer Nachweis erforderlich, muss er Folgendes umfassen: Bei einem Neubau den Nachweis der Tragfähigkeit, Gebrauchstauglichkeit und Dauerhaftigkeit des Tragwerks gemäß OIB-RL 1. Bei der nachträglichen Montage einer PV-Anlage: Bestandsaufnahme des Tragwerks mindestens in Stufe 1 gemäß OIB-RL 1; Nachweis der geringfügigen Auswirkung der Maßnahme (Lasterhöhung ≤ 3 %) ODER Nachweis der Tragfähigkeit, Gebrauchstauglichkeit und Dauerhaftigkeit…
BG 07: Analysis - Load bearing capacity for installation of PV systems
Determine whether the roof structure can bear additional load of PV installation and how big the load can be.
HR-06-Analysis - Structural
Before installing a PV system, it is crucial to assess the quality, structure, and condition of your roof to ensure it can support the installation.
FR-04-Studying the feasibility of the project - PV-ready building
Implementing a PV plant on your roof requires your building to be PV-ready in terms of: load bearing capacity; water-proofing; human accessibility; accessibility for PV panels; among other aspects.
IT-Roof Area and Structural Analysis
Before installing a photovoltaic (PV) system within a Renewable Energy Community (REC), it is essential to assess both the available roof surface and the structural capacity of the building.
121
Genehmigung - Baurecht
Genehmigung beantragen.
PV Plant 4 Services
▼
AT: Genehmigung - Bauordnung
Manche PV-Anlagen brauchen eine Bauanzeige, manche eine Baubewilligung, manche keines von beiden. In jedem Fall sind Brandschutz, Blendwirkung und Standsicherheit einzuhalten.
BG 05: Preliminary building permit for PV plants and direct power lines in urban environments
Obtain authorization by local authorities in order to construct PV plant and direct power lines.
HR-07-Permit Building Regulations
In order to even begin construction of a solar power plant, all construction and ownership documents must be up-to-date and in accordance with the law.
IT-Authorisation for PV plants in existing buildings and on the ground on the SUER platform
The service supports the user to join the SUER Platform (helpdesk for renewable energies) and provides the single model for permit for integrated PV plants systems in existing buildings.
130
Analyse - Elektroinstallation
Untersuchen Sie die bestehende Elektroinstallation im Gebäude.
PV Plant 6 Services
▼
BG 08-1: Analysis - Connection to the power grid for self consumption
Identify the nearest connection point to the grid with the DSO and check whether there are possibilities for augmentation of the feed in power. Check if there are any limitations on feed-in power, as well as the hardware requirements for connecting the PV system to the grid.
BG 08-2: Analysis - Power distribution cabinets
Assessment whether the existing power cabinets that service the building are sufficient to handle the current of the PV plant. Determine the ownership of power cabinets.
HR-08-1-Analysis - Wiring
Before proceeding with a PV installation, it is essential to evaluate whether the power rating of the existing wiring in your building is sufficient to handle the current of your PV plant.
HR-08-2-Analysis - Meters and Distribution Cabinets
Many households in Croatia have old electricity meters. New meters can be read remotely. In many houses meters and distribution cabinets are located inside the apartment.
FR-02-Analysing opportunity 4-Wiring
The goal of this step is to anticipate possible works of adaptation of your building wiring infrastructure to a future PV plant. The wiring infrastructure in your building connects the public grid to each of the private apartment and each of the collective equipments.
IT-Establishment of PV electrical connections and wiring assessment
Before proceeding with a PV installation within a Renewable Energy Community (REC), it is essential to assess the existing electrical infrastructure and its compatibility with the planned system.
135
Analyse - Stromnetz
Klären Sie die Voraussetzungen für den Netzanschluss Ihrer PV-Anlage.
PV Plant 15 Services
▼
AT: Analyse - Maximale Einspeisung Steiermark
Bei Anlagen bis 250 kW kann die Einspeiseleistung vorübergehend oder generell auf einen vereinbarten Höchstwert begrenzt werden, um einen sicheren und effizienten Netzbetrieb zu gewährleisten. Die Begrenzung darf 1 % der maximalen Leistung am Netzanschlusspunkt nicht überschreiten.
AT: Analyse - Freie Kapazität je Umspannwerk
Klären Sie, ob das Umspannwerk noch freie Kapazität hat. Verfügbare bzw. gebuchte Kapazitäten je Umspannwerk (Netzebene 4) werden quartalsweise veröffentlicht.
AT: Genehmigung - Netzanschluss
Netzbetreiber dürfen Anlagen bis 20 kW den Netzanschluss nicht verweigern. Eine Einspeiseleistung ist im Ausmaß der bereits vereinbarten Bezugsleistung garantiert.
AT: Analyse - Netzanschlusskosten
Zu bezahlen sind das Netzbereitstellungsentgelt und das Netzzutrittsentgelt. Der Verteilernetzbetreiber hat ab Eingang einer Anfrage 2 Wochen (Netzebene 7) bzw. 1 Monat (Netzebenen 1 bis 6) Zeit, einen Kostenvoranschlag zu erstellen.
BG 09-2: Analysis - Free capacity of the feeder/low voltage grid connection line
Obtain information of the DSO free grid capacity to assess whether it will be possible to sell surplus energy to the electricity market.
BG 09-1: Analysis - Additional grid connections
For a CEP/EC with several buildings included and several direct power lines between the participants more than one grid connections with different characteristics maybe explored.
BG 09-3: Obtaining a Permit for connection to the grid
To build a PV plant first of all is necessary to obtain preliminary permit by the DSO, stating that connection to the grid in the area is possible and is generally available.
HR-09-Analysis - Power Grid
When planning a PV installation, it is important to identify the nearest connection point to the grid to determine how the system will integrate with the existing infrastructure.
FR-10-Requiring connection to the grid
Connection to the grid is required for any PV plant. You have to go through a standard procedure with your DSO, Enedis in Paris.
FR-10-Simulating connection to the grid
Connecting to the grid is a key step. It is important to simulate and anticipate before you actually demand connection. You have to pay attention to assessing the need for renovation of your building electric wiring and meters.
FR-10-Getting a Proposition for grid connection
Once you have completed your demand for grid connection (DCR), you will receive within a defined timeframe a Proposition with a price to pay for connecting to the grid (PTF or PDR) that you will have to accept to launch construction work.
IT-Identification of Point of delivery
It is important to know the POD (Point of Delivery) in Renewable Energy Communities (RECs) because it uniquely identifies each electricity user within the grid.
IT-Mapping of primary substations
The interactive map of the primary substations helps developers of energy communities to identify grid connection area of the same primary electrical substation.
IT-Identification of critical areas
It is necessary to assess the capacity of the local electrical grid to accommodate the power generated and fed into the grid. DSOs have prepared maps of critical areas defined by color (Red high criticality, Orange medium, Yellow low, White very low).
IT-Permit: grid connection
When planning a PV installation, it is important to identify the nearest connection point to the grid. Check if there are any limitations on feed-in power. Review the hardware requirements for connecting your PV system to the grid.
150
Analyse - Synergien bei Bauarbeiten
Überlegen Sie, welche Bauarbeiten parallel zur Errichtung der PV-Anlage durchgeführt werden können.
Social 2 Services
▼
HR-10-Analysis - Construction Synergies and Fire protection
When installing a PV plant, it is beneficial to consider construction work that can be done concurrently to maximize efficiency and minimize disruptions.
FR-02-Analysing opportunity - PV project within a holistic approach
Planning works on your roof for the implementation of a PV plant is an opportunity to consider the building as a whole. You are advised to investigate the need for works in all technical dimensions, structural, architectural and environmental.
160
Analyse - Verbrauch
Verstehen Sie Ihren Strombedarf
PV Plant 7 Services
▼
AT: Analyse - Verbrauch
Ermitteln Sie den Jahresverbrauch. Ihr jährlicher Strombedarf steht auf Ihrer Stromrechnung. Sie finden ihn auch im Webportal Ihres Stromlieferanten und/oder Netzbetreibers.
AT: Analyse Verbrauchsprofil
Der Stromverbrauch lässt sich anhand alter Stromrechnungen abschätzen. Alternativ können Smart Meter über das Serviceportal des Netzbetreibers ausgelesen werden. Diese Zeitreihen geben Einblick in die Dynamik des Stromverbrauchs.
BG 10: Analysis - Consumption Profile
Find the consumption profile of the daily/monthly/annual routine of the EC buildings for the last three years.
HR-11-Analysis - Consumption
Understanding your energy needs is crucial for optimizing a PV installation. Start by assessing your daily, monthly, and annual consumption.
FR-02-Analysing opportunity 2-Consumption
Once you have estimated your potential for production, you have to question which use you will make of the electricity generated. Knowing your building or community consumption will give you an insight into the share of electricity generated that may be consumed.
FR-02-Getting consumption data
In order to analyse precisely the potential for self-consumption, it is useful to get first the actual consumption data of the buildings within the community. Enedis provides a free service called dataconsoelec.
IT-Analysis - Consumption
Understanding your energy needs is crucial for optimizing a PV installation. Start by assessing your daily, monthly, and annual consumption to determine the system size required to meet your energy demands.
170
Abnahmevertrag
Finden Sie jemanden, der Ihren überschüssigen Strom kauft.
PV Plant 6 Services
▼
AT: Analyse - Einspeisetarife
Vergleichen Sie verschiedene Preise für überschüssigen Solarstrom, zusammengefasst auf pvaustria.at
BG 11: Contract - Sale of excess electric energy to the market
Identifying, contacting and negotiating favorable off-take terms with consumers in the vicinity of the EC. Provide expert knowledge to EC for understanding and finding a suitable contractual partner.
HR-12-Uptake Agreement
Before integrating a PV system, verify if you qualify as an electricity vendor, as this status will determine your ability to sell excess energy back to the grid or to other members of CEP.
FR-12-Contracting purchase contract
You can contract a purchase contract if you choose to sell part or totality of your electricity. Either you sell it within a collective self-consumption operation (CSC) or to an independent buyer (PPA), or to an obliged buyer for 20 years.
IT-Contract - sale of excess electricity to GSE
The Ritiro Dedicato consists of the transfer to GSE of the electricity fed into the grid from photovoltaic systems. The GSE pays the producer a specific price for each kWh injected into the grid.
IT-Contract for sale of excess of electricity to the market
It consists of selling the excess of electricity fed into the grid from PV systems on the market.
180
Analyse - Ertrag
Wie groß wird meine PV-Anlage und was bringt sie?
PV Plant 7 Services
▼
AT: Analyse - Sonneneinstrahlung und Stromertrag
1) Ermitteln Sie die jährliche Sonneneinstrahlung an Ihrer Adresse (in kWh/m²/a). 2) Multiplizieren Sie sie mit der Anlagenfläche (in m²) und dem Wirkungsgrad (kW elektrisch / kW Einstrahlung).
BG 12-1: Analysis - Roof areas, solar radiation and electricity yield profile
Evaluate the available area for panel placement, determine how much photovoltaic capacity can be accommodated, assess the possible solar yield at the EC location. Recommend high efficiency PV panels.
BG 12-2: Analysis - Size of PV installations, electricity storages, direct power lines
This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages, direct power lines and power grid connections.
HR-13-Analysis - Yield
When planning a PV installation, start by evaluating the available area for panel placement to determine how much photovoltaic capacity can be accommodated.
FR-02-Analysing opportunity 1-Production
Estimating the production available on your building roof is probably the first step. It depends on many factors such as the surface of the roof available for PV panels, the energy it receives from the sun, its inclination and orientation.
FR-04-Studying the feasibility of the project
Once your project is launched and approved, it is necessary to have Professionals study the feasibility of your project. Feasibility study will give you a more precise simulation of production potential.
IT-Analysis - Solar Radiation and Electricity yield
This step aims to estimate the expected electricity production of the photovoltaic (PV) system based on local solar radiation conditions. The analysis includes: Determining the annual solar irradiation at the project location; Estimating the electricity yield.
190
Analyse - Wirtschaftlichkeit
Berechnen Sie Ausgaben und Erträge Ihrer PV-Anlage.
PV Plant 8 Services
▼
AT: Analyse Wirtschaftlichkeit
Verwenden Sie das Berechnungstool
AT: Analyse - Steuern
Wer eine Photovoltaikanlage betreibt, muss das österreichische Steuerrecht beachten. Erlöse aus dem Stromverkauf und/oder die private Nutzung des selbst erzeugten Stroms begründen eine Einkommensteuerpflicht. Außerdem ist die Umsatzsteuerpflicht zu klären.
BG 14-1: Analysis - Self energy consumption by CEP/EC participants
Use real and prognosis data for the last 3 years to match the electricity yield with the consumption profile of each of the CEP/EC participants.
BG 14-2: Key elements of economic and financial analysis and business plan
Evaluate the PV system to determine how much of the generated electricity can be used by the members of the EC and how much can be sold. Develop a business plan and a cash-flow analysis.
BG 14-3: Estimate - Costs
Estimate the costs related to the building of the PV installation, electricity battery storages, direct power lines between installations of participants in the CEPs/ECs.
HR-14-Analysis - Economics
When evaluating a PV system, determine how much of the generated electricity you can use personally versus how much can be sold or donated to others.
FR-02-Analysing opportunity 3-Economics
Once you have estimated potential for production and self-consumption of electricity, you have to know how much it should cost and how much you should benefit from it. The preassessment of economic balance gives you an estimation of the return on investment.
IT-Preliminary Energy and Economic assessment
Use SHARE - Simulator for Holistic energy-economic Assessment for Renewable Energy Communities, the calculation tool for economic and financial assessment, developed internally by AGENA.
191
Vorabschätzung - Finanzierung
Erste Einschätzung der Finanzierungsmöglichkeiten
PV Plant 2 Services
▼
BG 13: Financial concept
The feasibility of the technical solution is very much dependent on the possibility to finance the endeavor. Financial possibilities shall be assessed, consisting of own funding (equity), public funding and subsidies, as well as third party funding.
HR-15-Preassessment - Financing
The feasibility of a PV installation is very much dependent on the possibility to finance the endeavor.
193
Analyse - PV-Anlage
Verstehen Sie alle Komponenten Ihrer PV-Anlage
PV Plant 2 Services
▼
HR-16-Analysis - PV System - Documentation and Approval - Main Project
Generate a description or a graphic presentation or a conceptual design. Document shall include: a map of the electrical design, a map of the construction project, the structural analysis of the roof, architectural design.
IT-Analysis - Size of PV installations and electricity storages
This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages. The objective is to balance energy production and consumption in order to maximize self-consumption and shared energy within the REC.
2
Umsetzung
10 Schritte
205
Versicherung
Finden Sie einen Versicherer.
PV Plant 5 Services
▼
AT: Versicherung
Schließen Sie eine Versicherung ab. Sie deckt Schäden durch Hagel, Sturm, Blitzschlag und Feuer. Viele Gebäudeversicherungen enthalten diesen Schutz bereits. Für Anlagen, die nicht am Dach montiert sind, ist eine eigene Versicherung zu überlegen. Typische Kosten: 2 EUR pro kWp
BG 15: Insurance
The planning of the PV system requires to understand all risks and costs associated with insurance. It is crucial to be adequately covered for potential issues such as equipment damage, theft, or liability.
HR-17-Insurance
When planning your PV system, it is important to understand the risks and costs associated with insurance. The insurance policy is 0.5% of the total amount of the investment per year.
FR-07-Getting insurance
Once you have validated quotes for installation works, you need to check three types of insurance. Two are mandatory (installer insured for the systems; you as an electricity producer must contract a liability insurance) and one is optional.
IT-Insurance
This step aims to identify and secure appropriate insurance coverage for photovoltaic (PV) systems and the activities of the Renewable Energy Community (REC). Key risks: damage to PV equipment, theft, business interruption, third-party liability.
210
Rollen in der Gemeinschaft
Legen Sie das Kernteam und seine Verantwortlichkeiten fest.
Social 4 Services
▼
BG 16: Consulting EC roles
General consulting depending on the objectives of the CEP/EC, including organizational structure, workload and responsibility distribution and management structures.
HR-18-Community Roles
While key members were assigned during the development phase, these roles need to be reviewed in the realization phase and considered for additional roles.
FR-05-Defining community roles
For the development, implementation and exploitation of a PV plant and energy community, it is crucial to define roles. You can choose between different approaches: rely on community members, externalize chosen works, or externalize as many works as possible.
IT-Appointment of REC representative
The REC must appoint a representative (soggetto referente) responsible for managing relations with the GSE and handling operational and administrative obligations.
220
Finanzierung - Privatkapital
Sichern Sie die Finanzierung und beschaffen Sie externes Kapital.
PV Plant 5 Services
▼
AT: Finanzierung - Crowdfinanzierung
Bewerben Sie sich bei GeReGie für ein Crowdfinanzierungsmodell.
BG 17: Co-financing mechanisms with ESCOs/Private Banks/Crowdfunding
There are three potential ways to privately co-fund an EC project - getting a loan from a private bank, gathering resources from different investors in the form of crowdfunding and/or attracting one bigger investor in the form of an ESCO.
HR-19-Financing - Private Capital
To finance your project, consider three primary options: applying for a bank loan, finding investors, and crowdfunding.
FR-08-Getting a collective loan
Financing a PV installation in a condominium or community may require to contract a loan. Certain banks offer collective loans with low or zero rates, such as Eco Prets a Taux Zero (EcoPTZ) for collective housing.
IT-Access to private capital
This step defines the financing strategy for the implementation of photovoltaic (PV) systems and related infrastructure within a Renewable Energy Community (REC). Several financing models: Own resources; Bank loans; ESCO models; Public-private partnerships.
231
Finanzierung - Öffentliche Mittel
Sichern Sie die Finanzierung und beschaffen Sie externes Kapital.
PV Plant 8 Services
▼
AT: Finanzierung - Förderung
Das EAG sieht Investitionszuschüsse vor, für die Projekte bei laufenden Förderaufrufen eingereicht werden müssen. Der Investitionszuschuss ist mit höchstens 30 % des für die Errichtung der Anlage unmittelbar erforderlichen Investitionsvolumens begrenzt.
BG 18: Public co-financing for ECs
The public financing will guarantee the overall economic feasibility of the projects and thus support the involvement of private fund in the co-financing structure.
HR-20-Financing - Public Funding
To secure additional funding for your project, consider applying for grants and state loans.
FR-08-Accessing public aids
Access to finance is a challenge. Collective decision within condominium councils is generally facilitated if return on investment is made after less than 10 years, and all the more if the initial investment is lowered thanks to public aids.
IT-Access to the capital contribution - NRRP measure
This step concerns access to capital grants provided under the National Recovery and Resilience Plan (NRRP) to support the deployment of renewable energy systems within RECs located in municipalities with fewer than 50,000 inhabitants.
IT-Capital grant for citizens beneficiaries national energy income
This step identifies some of the options available to an REC for the implementation of systems for the production of energy from renewable sources. It is a capital grant aimed at the installation of domestic PV systems (from 2 kW to 6 kW), serving residential properties owned by households in economic hardship.
IT-Access to financial contributions
This step identifies financial contributions available. The financial contributions are granted for a period of 20 years. The eligible contributions are: Enhancement of self-consumed electricity; Incentivization (premium tariff) of shared electricity; Compensation for the withdrawal of electricity fed into the grid.
IT-Support for the investments - Bonus casa for citizens
Ten-year tax deduction for the installation of photovoltaic systems up to 200kW and energy storage systems, equal to 50% of the expenses incurred for the primary residence, with a spending cap of 96,000 euro per property unit.
242
Beschaffung - Ausrüstung
Ausschreibung starten und Ausrüstung kaufen
PV Plant 4 Services
▼
AT: Verbindliches Angebot für die Anlagenerrichtung einholen
Stellen Sie Vorplanungsunterlagen, den Lieferumfang, Angaben zu Standort, Adresse und Einschränkungen sowie Angaben zu Gebäude, Dach, Elektroinstallation und den betreffenden Räumen einschließlich Fotos bereit, dazu die Bestätigung über den Netzzugang.
BG 19: Construction - Installing PV System, direct connection lines, battery storage devices
Specify requirements for the PV installation/battery storage solutions detailing the technical and functional needs of the desired equipment, including any performance criteria or standards.
HR-21-Sourcing - Equipment
To ensure a successful procurement process, start by clearly specifying your requirements.
IT-Procurement procedures for PV systems for public bodies
If you are a public body, you can simplify the procedures for purchasing and installing photovoltaic systems directly on MePA (Electronic Market of Public Administration).
245
Beschaffung - Fachleute
Dienstleister und Fachkräfte für die Errichtung Ihrer PV-Anlage finden und beauftragen
PV Plant 3 Services
▼
BG 20: Professional expertise
This step consists in finding engineers and technicians for the installation of the PV plant. It involves the evaluation of qualified and recommended professionals.
HR-22-Sourcing - Professionals
To effectively realize your project, start by clearly communicating its characteristics to potential professionals.
FR-06-Choosing an installer
An installer must be certified by the State as RGE (Reconnu Garant de l'Environnement). Certification is mandatory to access public aids. An installer must be qualified for the right category of work.
250
Inbetriebnahme - Anlage
Holen Sie die Erlaubnis zur Inbetriebnahme ein
PV Plant 9 Services
▼
AT: Messgerät
Beantragen Sie die Installation eines Zählers. Der Zähler muss innerhalb von 3 Arbeitstagen (Standardlastprofil) bzw. 8 Arbeitstagen (Lastprofilzähler) nach Abschluss der Anmeldung eingebaut werden.
AT: Normen und Standards
Stellen Sie sicher, dass die Anlage den Normen und Standards entspricht
BG 21-1: Commissioning - PV systems, direct connection lines, battery storage devices
Conduct a thorough inspection to ensure that all components of the PV plant are properly installed and it operates safely. Confirm that all safety protocols are in place. Accept the take-over certificate from the engineer.
BG 21-2: Construction - SMART GRID automatic management system
Identifying an AI enabled SMART GRID system for fully automated control of all energy installations within the CEP/EC.
HR-23-Commissioning - Plant
Once the plant is installed, it is crucial to verify that it has been installed correctly. Assess whether the plant operates safely.
FR-11-Putting the plant into service
Once you have accepted the Proposition (PTF or PDR), you can proceed to the building of the plant. Then you will have to commission the plant to ensure it is perfectly secure. Consuel is the mandated organism for commissioning.
IT-Registration on GAUDI portal
The registration of a photovoltaic system on Gaudi Terna is a fundamental and binding step for connecting the photovoltaic system to the national electricity grid. Without a valid registration on the Gaudi portal, it is not possible to connect your photovoltaic system to the national grid.
IT-Commissioning PV system
After getting the permission to start operation, the installer has to install the plant correctly, check if it operates safely and meets all regulatory requirements.
IT-Norms and Standards
Ensure that the plant and the overall Renewable Energy Community (REC) system are designed, installed, and commissioned in compliance with all applicable technical standards, safety regulations, and grid connection requirements.
260
Rechtsträger gründen
Gründen Sie Ihre Erneuerbare-Energie-Gemeinschaft als Rechtsträger.
REC 5 Services
▼
AT: Rechtsform
Eine Energiegemeinschaft muss eine eigene Rechtsperson werden. Am günstigsten ist die Gründung eines Vereins bei der Vereinsbehörde: Bezirkshauptmannschaft oder Landespolizeidirektion
BG 22: Legal entity consulting
Review of national regulations for the establishment of a legal entity to set up the REC or operate a CEP, including rules of procedures, limitations and possible (dis)advantages.
HR-24-Establish Legal Entity
When setting up a Renewable Energy Community (REC) or Citizen Energy Community (CEC) in Croatia, you have to establish non-profit association.
FR-13-Establishing legal entity for collective self-consumption
A legal entity gathering producers and consumers that will exchange energy among themselves is mandatory in the French law. It is called a Moral Organizing Persona (PMO in French).
IT-Definition and Establishment of the Legal Entity
A Renewable Energy Community must be established as an independent legal entity. This step includes both the selection of the most suitable legal model and the formal establishment of the entity.
270
Registrierung - Markt
Registrieren Sie Ihre Energiegemeinschaft für die Teilnahme an den Prozessen des Strommarkts.
REC 7 Services
▼
AT: Registrierung - Marktteilnehmer
ebUtilities.at stellt das Marktpartnerverzeichnis mit den registrierten Marktpartnern bereit. Betreiber (künftiger) Energiegemeinschaften müssen sich auf der Plattform registrieren und erhalten nach etwa 2 Tagen eine eindeutige Marktpartner-ID.
AT: Registrierung - Netzbetreiber
Energiegemeinschaften müssen einen Vertrag mit dem Netzbetreiber abschließen.
AT: Registrierung - EDA-Portal
Das EDA-Portal ist eine Webplattform für Energiedienstleister und Energiegemeinschaften. Es bietet einfachen Zugang zu Daten der Energiewirtschaft.
AT: Registrierung - Mitglieder der Energiegemeinschaft
Mit Ihrem EDA-Zugang können Sie im EDA-Portal eine neue Energiegemeinschaft anlegen. Danach können Sie andere zum Beitritt einladen.
BG 23: Registration as market participant (ESO and SEDA)
To actively participate in electricity market processes, you must register the REC with the electricity system operator (ESO) and the sustainable energy development agency (SEDA) for reporting purposes.
HR-25-Registration - Market
To actively participate in electricity market processes, you must register your License to perform energy activities issued by HERA.
IT-Registration on GSE portal
Registration with the GSE is required for the official recognition of the REC and access to incentive schemes. At this stage, the REC is configured from both an administrative and technical perspective.
290
Registrierung - Steuer
Melden Sie Ihre Energiegemeinschaft bei der Steuerbehörde an.
REC 7 Services
▼
AT: Registrierung - Steuer
Sie erhalten Post vom Finanzamt. Melden Sie die Aufnahme der Vereinstätigkeit und übermitteln Sie ein Unterschriftsprobenblatt.
AT: Registrierung - UID-Nummer
Für Energiegemeinschaften mit einem Umsatz von höchstens 55.000 Euro pro Jahr gilt die Kleinunternehmerregelung (Umsatzsteuerbefreiung). Sie müssen keine Umsatzsteuer an das Finanzamt abführen, dürfen auf ihren Rechnungen aber auch keine Umsatzsteuer ausweisen.
BG 24: Registration with the National Revenue Agency
Registration of the legal entity of the REC with the National Revenue Agency of Bulgaria for tax purposes. Once registered, you will receive a tax verification number.
HR-26-Registration - Tax
In Croatia, it is only possible to register REC or CEC as association - nonprofit organization. Once registered, you will receive a tax verification number.
IT-Registration on the business registry
Depending on the chosen legal form, the REC may be required to register in the Business Register (Registro delle Imprese) at the competent Chamber of Commerce.
IT-Tax Registration
Once established as a legal entity, the REC must be registered with the Revenue Agency to obtain a tax identification code and, if required, a VAT number.
IT-Plant Registration with Customs and Monopolies Agency
This step involves the formal registration of an electricity generation plant with the Agenzia delle Dogane e dei Monopoli (ADM). Plants with capacity above 20 kW must be registered as electric workshops (officine elettriche).
3
Betrieb
5 Schritte
320
Wartung - Hardware
Regelmäßige Wartung und Reparaturen der PV-Anlage durchführen.
PV Plant 4 Services
▼
BG 25: Maintenance of HW
Ensure the regular maintenance and repairs of the PV plant and other energy installations of the CEP/EC.
HR-27-Maintenance - HW
Regular maintenance and repairs are crucial for ensuring the efficiency and longevity of your PV plant. The cost of maintenance is about 0.3% of the investment per year.
FR-15-Maintenance of your PV plant
Maintenance is necessary to ensure correct functioning. Maintenance can be made by yourself as a producer, by professionals. It is advised to have an annual visual check of your plant.
IT-Maintenance Recommendations
Ensure the proper operation and optimal performance of the REC photovoltaic systems through regular and extraordinary maintenance activities. Average maintenance costs are estimated at 0.5%-1% of the initial investment per year.
330
Mitglieder - Verwaltung
Eintritt und Austritt von Mitgliedern der Energiegemeinschaft.
REC 4 Services
▼
BG 26: Membership changes
In order to manage the CEP/EC effectively, report any membership changes to the power grid operator to ensure accurate records. Register new participants in the REC and update the member list.
HR-28-Membership - Administration
To manage your CEP effectively, report any membership changes to the power grid operator to ensure accurate records.
FR-16-On- and off-boarding of members
Throughout the lifecycle of your project, you may wish to recruit new members, and members may wish to leave the community. Informal at the start, membership will become formal once you have created a legal entity.
IT-Membership changes
In order to manage the REC effectively, report any membership changes to the GSE to ensure accurate records. Register new participants in the REC and update the member list.
350
Abrechnung
Periodische Abrechnung von Stromverbrauch und Einspeisung.
REC 5 Services
▼
AT: Abrechnung - Monatliche Rechnungslegung
Betreiber von Energiegemeinschaften haben Zugriff auf die Verbrauchs- und Einspeisedaten jedes Mitglieds. Aus diesen Daten müssen Rechnungen erstellt werden, die regelmäßig zu versenden sind.
AT: Abrechnung - Preisblatt
Die Kosten für den Strombezug aus der Energiegemeinschaft müssen regelmäßig angepasst und kommuniziert werden.
BG 27: Billing
Ensure provision of SMART GRID solutions for metering in real time of energies delivered within the CEP/EC and to/from the grid; clearance of mutual deliveries between the participants and traders, and billing of energy.
HR-29-Billing
For effective billing and periodic settlement of electricity consumption and feed-in, start by collecting accurate energy data.
IT-Billing and incentive management
The billing process includes: Metering and data collection from each member's POD; Aggregation and processing of data; Calculation of self-consumed and shared energy; Determination of energy injected or withdrawn from the national grid; Application of incentive mechanisms.
360
Buchhaltung
Buchführung und Berichterstattung an die Steuerbehörden
REC 4 Services
▼
BG 28: Accounting
Analyse and instruct your accounting expert for the specific requirements for the tax reporting of the energy community.
HR-30-Accounting
Effective accounting and bookkeeping involve preparing financial statements to provide a clear overview of the project financial health.
FR-14-Exploitation of a self-consumption operation
A collective self-consumption operation is heavier to exploit than a mere PV plant. Your implication as a person or community can be more or less important depending on your wishes, availabilities and competencies.
IT-Accounting
Effective accounting includes: Managing day-to-day bookkeeping; Preparing financial statements and reports; Ensuring compliance with all legal and regulatory requirements; Reconciling accounts.
380
Mitglieder - Einbindung
Service für Mitglieder und laufende Einbindung.
Social 4 Services
▼
BG 29: Membership engagement
In order to ensure transparency and accountable management of the CEP/EC their members should be regularly updated with current development, problems and achievements.
HR-31-Membership - Engagement
To maintain CEP member services and continuous engagement, keep members updated with the latest information and developments.
FR-17-Membership engagement
Recruiting new consumers and producers is a way for the community to optimize self-consumption rates and inject to the grid the least of surplus possible.
IT-Membership engagement
To maintain CEP member services and continuous engagement, keep members updated with the latest information and developments. Actively recruit new members to expand the community and enhance its impact.