This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages, direct power lines and power grid connections.
Find out how much kWp the PV installations should have in accordance with the consumption profiles and available rooftop areas. Determine the capacity of the electricity storages.
- Was der Initiator bereitstellen muss
Consumption profiles of every CEP/EC participants and CEP/EC configuration drawings.
- Ergebnis
PV installations sizes in kWp; Electricity storages sizes in kWh; Direct power lines and power grid connections sizes.