Conduct a thorough inspection to ensure that all components of the PV plant are properly installed and it operates safely. Confirm that all safety protocols are in place. Accept the take-over certificate from the engineer.

After equipping the existing connection and building direct connection lines, electricity battery storage devices and SMART GRID automatic control system, the CEP/EC energy installations are put into permanent operation

Was der Initiator bereitstellen muss

Approved construction documentation, construction contract, financing.

Ergebnis

Grid connection, direct connection lines, electricity storage devices and SMART GRID automatic control system within the CEP/EC completed and operational.