HR-16-Analysis - PV System - Documentation and Approval - Main Project
Generate a description or a graphic presentation or a conceptual design. Document shall include: a map of the electrical design, a map of the construction project, the structural analysis of the roof, architectural design.
The main project precisely defines the necessary interventions. As a rule, the project documentation also fulfils the function of detailed documentation, so all performance representations necessary for the implementation of works are required.
- Angeboten von
- NETeko d.o.o.
- Was der Initiator bereitstellen muss
Electrical design, structural analysis, architectural design
- Ergebnis
Main Project Approved; Project contains: components for PV plant (panels, inverter, battery); requirements for interconnections; requirements for location; technical documentation
- Verbleibende Hürden
The input from professionals and experts can become a bottleneck. They are high in demand, resulting in long lead times.