AT: Insurance

Find insurance. Covers damage from hail, storms, lightning strikes, and fire. Many building insurances already include coverage. Consider separate insurance for off roof installations. Typical costs: 2 EUR per kWp

Austria Realisation

AT: Financing - Crowd Financing

Apply for a crowd financing scheme with GeReGi.

Austria Realisation

AT: Financing - Grant

The EAG grants investment subsidies, for which project proposals must be submitted to ongoing funding programs. The amount of the investment subsidy is limited to a maximum of 30% of the investment volume directly required for the construction of the system.

Austria Realisation

AT: Enquire binding offer for plant construction

Provide pre-planning documents, scope of equipment, information about location, address, restrictions, information about building, roof, electrical installations and related locations including pictures, provide grid access confirmation document.

Austria Realisation

AT: Metering Device

Request installation of a meter. The installation of a meter must take place within 3 working days (standard load profile) or 8 working days (load profile meter) after the completion of the registration.

Austria Realisation

AT: Norms and Standards

Ensure that the system complies with the norms and standards

Austria Realisation

AT: Legal Entity

An energy community needs to become a legal entity. The cheapest option is to establish a society (Verein) at the local authority: District Commission (Bezirkshauptmannschaft) or Regional Police Directorate (Landespolizeidirektion)

Austria Realisation

AT: Registration - Market Participant

ebUtilities.at provides the market partner directory which includes registered market partners. Operators of (future) energy communities need to register on the platform. They will receive a unique Market Partner ID after approximately 2 days.

Austria Realisation

AT: Registration - Grid Operator

Energy communities need to sign a contract with the grid operator.

Austria Realisation

AT: Registration - EDA Portal

The EDA Portal is a web platform for energy service providers and energy communities. It provides easy access to energy industry data.

Austria Realisation

AT: Registration - EC members

With your eda access, you can create a new energy community in your eda portal. Afterwards you can invite others to join your community.

Austria Realisation

AT: Registration - Tax

You will receive mail from the tax authority. Notify them about the commencement of association activities and provide a signature sample.

Austria Realisation

AT: Registration - VAT Number

For energy communities whose turnover does not exceed 55,000 euros p.a., the tax exemption for small businesses applies. These entrepreneurs do not need to pay VAT to the tax office; however, they are not allowed to show VAT on invoices they issue.

Austria Realisation

BG 15: Insurance

The planning of the PV system requires to understand all risks and costs associated with insurance. It is crucial to be adequately covered for potential issues such as equipment damage, theft, or liability.

Bulgaria Realisation

BG 16: Consulting EC roles

General consulting depending on the objectives of the CEP/EC, including organizational structure, workload and responsibility distribution and management structures.

Bulgaria Realisation

BG 17: Co-financing mechanisms with ESCOs/Private Banks/Crowdfunding

There are three potential ways to privately co-fund an EC project - getting a loan from a private bank, gathering resources from different investors in the form of crowdfunding and/or attracting one bigger investor in the form of an ESCO.

Bulgaria Realisation

BG 18: Public co-financing for ECs

The public financing will guarantee the overall economic feasibility of the projects and thus support the involvement of private fund in the co-financing structure.

Bulgaria Realisation

BG 19: Construction - Installing PV System, direct connection lines, battery storage devices

Specify requirements for the PV installation/battery storage solutions detailing the technical and functional needs of the desired equipment, including any performance criteria or standards.

Bulgaria Realisation

BG 20: Professional expertise

This step consists in finding engineers and technicians for the installation of the PV plant. It involves the evaluation of qualified and recommended professionals.

Bulgaria Realisation

BG 21-1: Commissioning - PV systems, direct connection lines, battery storage devices

Conduct a thorough inspection to ensure that all components of the PV plant are properly installed and it operates safely. Confirm that all safety protocols are in place. Accept the take-over certificate from the engineer.

Bulgaria Realisation

BG 21-2: Construction - SMART GRID automatic management system

Identifying an AI enabled SMART GRID system for fully automated control of all energy installations within the CEP/EC.

Bulgaria Realisation

BG 22: Legal entity consulting

Review of national regulations for the establishment of a legal entity to set up the REC or operate a CEP, including rules of procedures, limitations and possible (dis)advantages.

Bulgaria Realisation

BG 23: Registration as market participant (ESO and SEDA)

To actively participate in electricity market processes, you must register the REC with the electricity system operator (ESO) and the sustainable energy development agency (SEDA) for reporting purposes.

Bulgaria Realisation

BG 24: Registration with the National Revenue Agency

Registration of the legal entity of the REC with the National Revenue Agency of Bulgaria for tax purposes. Once registered, you will receive a tax verification number.

Bulgaria Realisation