IT-Procurement procedures for PV systems for public bodies

If you are a public body, you can simplify the procedures for purchasing and installing photovoltaic systems directly on MePA (Electronic Market of Public Administration).

Italy Réalisation

IT-Registration on GAUDI portal

The registration of a photovoltaic system on Gaudi Terna is a fundamental and binding step for connecting the photovoltaic system to the national electricity grid. Without a valid registration on the Gaudi portal, it is not possible to connect your photovoltaic system to the national grid.

Italy Réalisation

IT-Commissioning PV system

After getting the permission to start operation, the installer has to install the plant correctly, check if it operates safely and meets all regulatory requirements.

Italy Réalisation

IT-Norms and Standards

Ensure that the plant and the overall Renewable Energy Community (REC) system are designed, installed, and commissioned in compliance with all applicable technical standards, safety regulations, and grid connection requirements.

Italy Réalisation

IT-Definition and Establishment of the Legal Entity

A Renewable Energy Community must be established as an independent legal entity. This step includes both the selection of the most suitable legal model and the formal establishment of the entity.

Italy Réalisation

IT-Registration on GSE portal

Registration with the GSE is required for the official recognition of the REC and access to incentive schemes. At this stage, the REC is configured from both an administrative and technical perspective.

Italy Réalisation

IT-Registration on the business registry

Depending on the chosen legal form, the REC may be required to register in the Business Register (Registro delle Imprese) at the competent Chamber of Commerce.

Italy Réalisation

IT-Tax Registration

Once established as a legal entity, the REC must be registered with the Revenue Agency to obtain a tax identification code and, if required, a VAT number.

Italy Réalisation

IT-Plant Registration with Customs and Monopolies Agency

This step involves the formal registration of an electricity generation plant with the Agenzia delle Dogane e dei Monopoli (ADM). Plants with capacity above 20 kW must be registered as electric workshops (officine elettriche).

Italy Réalisation