IT-Analysis - Size of PV installations and electricity storages
This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages. The objective is to balance energy production and consumption in order to maximize self-consumption and shared energy within the REC.
IT-Insurance
This step aims to identify and secure appropriate insurance coverage for photovoltaic (PV) systems and the activities of the Renewable Energy Community (REC). Key risks: damage to PV equipment, theft, business interruption, third-party liability.
IT-Appointment of REC representative
The REC must appoint a representative (soggetto referente) responsible for managing relations with the GSE and handling operational and administrative obligations.
IT-Access to private capital
This step defines the financing strategy for the implementation of photovoltaic (PV) systems and related infrastructure within a Renewable Energy Community (REC). Several financing models: Own resources; Bank loans; ESCO models; Public-private partnerships.
IT-Access to the capital contribution - NRRP measure
This step concerns access to capital grants provided under the National Recovery and Resilience Plan (NRRP) to support the deployment of renewable energy systems within RECs located in municipalities with fewer than 50,000 inhabitants.
IT-Capital grant for citizens beneficiaries national energy income
This step identifies some of the options available to an REC for the implementation of systems for the production of energy from renewable sources. It is a capital grant aimed at the installation of domestic PV systems (from 2 kW to 6 kW), serving residential properties owned by households in economic hardship.
IT-Access to financial contributions
This step identifies financial contributions available. The financial contributions are granted for a period of 20 years. The eligible contributions are: Enhancement of self-consumed electricity; Incentivization (premium tariff) of shared electricity; Compensation for the withdrawal of electricity fed into the grid.
IT-Support for the investments - Bonus casa for citizens
Ten-year tax deduction for the installation of photovoltaic systems up to 200kW and energy storage systems, equal to 50% of the expenses incurred for the primary residence, with a spending cap of 96,000 euro per property unit.
IT-Procurement procedures for PV systems for public bodies
If you are a public body, you can simplify the procedures for purchasing and installing photovoltaic systems directly on MePA (Electronic Market of Public Administration).
IT-Registration on GAUDI portal
The registration of a photovoltaic system on Gaudi Terna is a fundamental and binding step for connecting the photovoltaic system to the national electricity grid. Without a valid registration on the Gaudi portal, it is not possible to connect your photovoltaic system to the national grid.
IT-Commissioning PV system
After getting the permission to start operation, the installer has to install the plant correctly, check if it operates safely and meets all regulatory requirements.
IT-Norms and Standards
Ensure that the plant and the overall Renewable Energy Community (REC) system are designed, installed, and commissioned in compliance with all applicable technical standards, safety regulations, and grid connection requirements.
IT-Definition and Establishment of the Legal Entity
A Renewable Energy Community must be established as an independent legal entity. This step includes both the selection of the most suitable legal model and the formal establishment of the entity.
IT-Registration on GSE portal
Registration with the GSE is required for the official recognition of the REC and access to incentive schemes. At this stage, the REC is configured from both an administrative and technical perspective.
IT-Registration on the business registry
Depending on the chosen legal form, the REC may be required to register in the Business Register (Registro delle Imprese) at the competent Chamber of Commerce.
IT-Tax Registration
Once established as a legal entity, the REC must be registered with the Revenue Agency to obtain a tax identification code and, if required, a VAT number.
IT-Plant Registration with Customs and Monopolies Agency
This step involves the formal registration of an electricity generation plant with the Agenzia delle Dogane e dei Monopoli (ADM). Plants with capacity above 20 kW must be registered as electric workshops (officine elettriche).
IT-Maintenance Recommendations
Ensure the proper operation and optimal performance of the REC photovoltaic systems through regular and extraordinary maintenance activities. Average maintenance costs are estimated at 0.5%-1% of the initial investment per year.
IT-Membership changes
In order to manage the REC effectively, report any membership changes to the GSE to ensure accurate records. Register new participants in the REC and update the member list.
IT-Billing and incentive management
The billing process includes: Metering and data collection from each member's POD; Aggregation and processing of data; Calculation of self-consumed and shared energy; Determination of energy injected or withdrawn from the national grid; Application of incentive mechanisms.
IT-Accounting
Effective accounting includes: Managing day-to-day bookkeeping; Preparing financial statements and reports; Ensuring compliance with all legal and regulatory requirements; Reconciling accounts.
IT-Membership engagement
To maintain CEP member services and continuous engagement, keep members updated with the latest information and developments. Actively recruit new members to expand the community and enhance its impact.