Estimate the costs related to the building of the PV installation, electricity battery storages, direct power lines between installations of participants in the CEPs/ECs.

Build purchase/cost lists for the equipment, needed to construct the E.C. energy installations.

What the initiator needs to provide

Data about size and configuration, technical descriptions and characteristics with technical drawings.

Result

Labor and material costs in the form of bill of quantities and values