When planning a PV installation, it is important to identify the nearest connection point to the grid to determine how the system will integrate with the existing infrastructure.

Obtaining Special Conditions Verification of the Possibility of Connecting a Household with its own Production requires: preparation and collection of documentation and completion of application for the issuance of electricity approval from HEP ODS

Offerto da
HEP ODS
Cosa deve fornire il promotore

Document of legality of existing building; Document of ownership of building; Construction plans; Structural analysis; Electrical installation project for PV plant

Risultato

Special Conditions Verification obtained from HEP ODS; Offer for equipment for billing metering point from HEP ODS

Ostacoli residui

Insufficient capacity of the DSO in certain periods