166 services

FR-13-Establishing legal entity for collective self-consumption

A legal entity gathering producers and consumers that will exchange energy among themselves is mandatory in the French law. It is called a Moral Organizing Persona (PMO in French).

France Realisation

FR-15-Maintenance of your PV plant

Maintenance is necessary to ensure correct functioning. Maintenance can be made by yourself as a producer, by professionals. It is advised to have an annual visual check of your plant.

France Operation

FR-16-On- and off-boarding of members

Throughout the lifecycle of your project, you may wish to recruit new members, and members may wish to leave the community. Informal at the start, membership will become formal once you have created a legal entity.

France Operation

FR-14-Exploitation of a self-consumption operation

A collective self-consumption operation is heavier to exploit than a mere PV plant. Your implication as a person or community can be more or less important depending on your wishes, availabilities and competencies.

France Operation

FR-17-Membership engagement

Recruiting new consumers and producers is a way for the community to optimize self-consumption rates and inject to the grid the least of surplus possible.

France Operation

IT-Expression of interest in joining a REC

Inform the community about the creation of the REC in the municipality by publishing the notice of expression of interest and collecting memberships.

Italy Planning

IT-Identification of REC initiators

Gather motivated individuals/PMI/local authorities who want to participate in a REC.

Italy Planning

IT-Identification of existing RECs

Joining an already established REC can significantly simplify the process compared to creating a new one. Existing communities have usually already completed the main administrative, legal, and technical steps required to operate.

Italy Planning

IT-Community Assessment

To start your own REC, it is important to begin with a project idea, identifying a first group of promoters, the operational perimeter of the REC, the renewable sources to be used, and the general consumption/production profile.

Italy Planning

IT-Value proposition

The initial vision of your project should clearly outline its overarching goals and aspirations. Consider the potential outcomes of the project to define its success criteria and impact.

Italy Planning

IT-Application for environmental permit

Determining whether an environmental assessment is required depends on the specifics of your project. Generally, an assessment is necessary if the plant size exceeds certain thresholds set by regulatory agencies.

Italy Planning

IT-Analysis of Heritage, Environmental and Spatial Planning Constraints

When planning a photovoltaic (PV) installation within a Renewable Energy Community (REC), it is essential to assess all regulatory and environmental constraints affecting the project site.

Italy Planning

IT-Roof Area and Structural Analysis

Before installing a photovoltaic (PV) system within a Renewable Energy Community (REC), it is essential to assess both the available roof surface and the structural capacity of the building.

Italy Planning

IT-Authorisation for PV plants in existing buildings and on the ground on the SUER platform

The service supports the user to join the SUER Platform (helpdesk for renewable energies) and provides the single model for permit for integrated PV plants systems in existing buildings.

Italy Planning

IT-Establishment of PV electrical connections and wiring assessment

Before proceeding with a PV installation within a Renewable Energy Community (REC), it is essential to assess the existing electrical infrastructure and its compatibility with the planned system.

Italy Planning

IT-Identification of Point of delivery

It is important to know the POD (Point of Delivery) in Renewable Energy Communities (RECs) because it uniquely identifies each electricity user within the grid.

Italy Planning

IT-Mapping of primary substations

The interactive map of the primary substations helps developers of energy communities to identify grid connection area of the same primary electrical substation.

Italy Planning

IT-Identification of critical areas

It is necessary to assess the capacity of the local electrical grid to accommodate the power generated and fed into the grid. DSOs have prepared maps of critical areas defined by color (Red high criticality, Orange medium, Yellow low, White very low).

Italy Planning

IT-Permit: grid connection

When planning a PV installation, it is important to identify the nearest connection point to the grid. Check if there are any limitations on feed-in power. Review the hardware requirements for connecting your PV system to the grid.

Italy Planning

IT-Analysis - Consumption

Understanding your energy needs is crucial for optimizing a PV installation. Start by assessing your daily, monthly, and annual consumption to determine the system size required to meet your energy demands.

Italy Planning

IT-Contract - sale of excess electricity to GSE

The Ritiro Dedicato consists of the transfer to GSE of the electricity fed into the grid from photovoltaic systems. The GSE pays the producer a specific price for each kWh injected into the grid.

Italy Planning

IT-Contract for sale of excess of electricity to the market

It consists of selling the excess of electricity fed into the grid from PV systems on the market.

Italy Planning

IT-Analysis - Solar Radiation and Electricity yield

This step aims to estimate the expected electricity production of the photovoltaic (PV) system based on local solar radiation conditions. The analysis includes: Determining the annual solar irradiation at the project location; Estimating the electricity yield.

Italy Planning

IT-Preliminary Energy and Economic assessment

Use SHARE - Simulator for Holistic energy-economic Assessment for Renewable Energy Communities, the calculation tool for economic and financial assessment, developed internally by AGENA.

Italy Planning