FR-10-Simulating connection to the grid
English
français
Connecting to the grid is a key step. It is important to simulate and anticipate before you actually demand connection. You have to pay attention to assessing the need for renovation of your building electric wiring and meters.
The OSS helps you understand what is at stake at this key step.
- Offered by
- ENEDIS
- What the initiator needs to provide
Power capacity of the existing meter of your building; Electric wiring schemes; Choice of injection and power of installation
- Result
Better understanding; Cost and complexity of connecting to the public grid; Anticipating the standard procedure.
- Remaining hurdles
Results of the simulation may not be easy to interpret.