Catalogo dei servizi
166 servizi
AT: Analysis - Structural
If a structural analysis is required, then it must include the following: For a new building: Proof of the load-bearing capacity, usability, and durability of the load-bearing structure in accordance with OIB-RL 1. For the subsequent installation of a PV system: Survey of the existing structure, at least to Level 1, in accordance with the guidelines of OIB-RL 1; Proof of the minimal impact of the measure (load increase <= 3%) OR Proof of the load-bearing capacity, usability, and durability of…
AT: Permit - Building Code
Some PV installations need building notification (Bausanzeige), some need building permit (Baubewilligung) some need none. In any case, compliance with fire protection, glare, and structural integrity is required.
AT: Analysis - Max Feed-In Steiermark
For systems up to 250 kW, the feed-in capacity can be temporarily or generally reduced to an agreed maximum value to guarantee safe and efficient operation of the grid. The limitation may not exceed 1% of the maximum capacity at the grid connection point.
AT: Analysis - Free capacity per substation
Understand if the substation still has free capacity. Available or booked capacities per substation (network level 4) are published quarterly.
AT: Permit - Grid Connection
Grid operators cannot deny Systems <= 20 kW from being connected to the grid. A feed-in capacity is guaranteed up to the extent of the already agreed consumption capacity.
AT: Analysis - Grid Connection Costs
Pay grid provision fee (Netzbereitstellung) and the grid access fee (Netzzutrittsentgelt). The distribution system operator has 2 weeks (network level 7) or 1 month (network levels 1 to 6) from the receipt of a request to provide a cost estimate.
AT: Analysis - Consumption
Determine the annual consumption. Your annual electricity demand is stated on your utility bill. You also find it on the web portal of your electricity provider and/or grid operator.
AT: Analysis Consumption Profile
Electricity consumption can be estimated based on old electricity bills. Alternatively, smart meters can be read via the service portal of the grid operator. These time series provide insight into the dynamics of electricity consumption.
AT: Analysis - Feed-in tariffs
Compare various prices for excess solar electricity, summarized on pvaustria.at
AT: Analysis - Solar Radiation and Electricity yield
1) Determine the Annual Solar Radiation for your address (in kWh/m2/a). 2) Multiply with your plant size (in m2) and efficiency (kWelectric / kWradiation)
AT: Analysis - Tax
Anyone who operates a photovoltaic system must consider Austrian tax law. The revenue from electricity sales and/or the use of self-generated electricity for private purposes creates an income tax obligation. Additionally, the question of VAT liability must be clarified.
AT: Insurance
Find insurance. Covers damage from hail, storms, lightning strikes, and fire. Many building insurances already include coverage. Consider separate insurance for off roof installations. Typical costs: 2 EUR per kWp
AT: Financing - Crowd Financing
Apply for a crowd financing scheme with GeReGi.
AT: Financing - Grant
The EAG grants investment subsidies, for which project proposals must be submitted to ongoing funding programs. The amount of the investment subsidy is limited to a maximum of 30% of the investment volume directly required for the construction of the system.
AT: Enquire binding offer for plant construction
Provide pre-planning documents, scope of equipment, information about location, address, restrictions, information about building, roof, electrical installations and related locations including pictures, provide grid access confirmation document.
AT: Metering Device
Request installation of a meter. The installation of a meter must take place within 3 working days (standard load profile) or 8 working days (load profile meter) after the completion of the registration.
AT: Norms and Standards
Ensure that the system complies with the norms and standards
AT: Legal Entity
An energy community needs to become a legal entity. The cheapest option is to establish a society (Verein) at the local authority: District Commission (Bezirkshauptmannschaft) or Regional Police Directorate (Landespolizeidirektion)
AT: Registration - Market Participant
ebUtilities.at provides the market partner directory which includes registered market partners. Operators of (future) energy communities need to register on the platform. They will receive a unique Market Partner ID after approximately 2 days.
AT: Registration - Grid Operator
Energy communities need to sign a contract with the grid operator.
AT: Registration - EDA Portal
The EDA Portal is a web platform for energy service providers and energy communities. It provides easy access to energy industry data.
AT: Registration - EC members
With your eda access, you can create a new energy community in your eda portal. Afterwards you can invite others to join your community.
AT: Registration - Tax
You will receive mail from the tax authority. Notify them about the commencement of association activities and provide a signature sample.