AT: Analysis - Structural
If a structural analysis is required, then it must include the following: For a new building: Proof of the load-bearing capacity, usability, and durability of the load-bearing structure in accordance with OIB-RL 1. For the subsequent installation of a PV system: Survey of the existing structure, at least to Level 1, in accordance with the guidelines of OIB-RL 1; Proof of the minimal impact of the measure (load increase <= 3%) OR Proof of the load-bearing capacity, usability, and durability of…
AT: Permit - Building Code
Some PV installations need building notification (Bausanzeige), some need building permit (Baubewilligung) some need none. In any case, compliance with fire protection, glare, and structural integrity is required.
AT: Analysis - Max Feed-In Steiermark
For systems up to 250 kW, the feed-in capacity can be temporarily or generally reduced to an agreed maximum value to guarantee safe and efficient operation of the grid. The limitation may not exceed 1% of the maximum capacity at the grid connection point.
AT: Analysis - Free capacity per substation
Understand if the substation still has free capacity. Available or booked capacities per substation (network level 4) are published quarterly.
AT: Permit - Grid Connection
Grid operators cannot deny Systems <= 20 kW from being connected to the grid. A feed-in capacity is guaranteed up to the extent of the already agreed consumption capacity.
AT: Analysis - Grid Connection Costs
Pay grid provision fee (Netzbereitstellung) and the grid access fee (Netzzutrittsentgelt). The distribution system operator has 2 weeks (network level 7) or 1 month (network levels 1 to 6) from the receipt of a request to provide a cost estimate.
AT: Analysis - Consumption
Determine the annual consumption. Your annual electricity demand is stated on your utility bill. You also find it on the web portal of your electricity provider and/or grid operator.
AT: Analysis Consumption Profile
Electricity consumption can be estimated based on old electricity bills. Alternatively, smart meters can be read via the service portal of the grid operator. These time series provide insight into the dynamics of electricity consumption.
AT: Analysis - Feed-in tariffs
Compare various prices for excess solar electricity, summarized on pvaustria.at
AT: Analysis - Solar Radiation and Electricity yield
1) Determine the Annual Solar Radiation for your address (in kWh/m2/a). 2) Multiply with your plant size (in m2) and efficiency (kWelectric / kWradiation)
AT: Analysis - Tax
Anyone who operates a photovoltaic system must consider Austrian tax law. The revenue from electricity sales and/or the use of self-generated electricity for private purposes creates an income tax obligation. Additionally, the question of VAT liability must be clarified.
BG 01: Community building
Create an initiative committee by experienced individuals. Organize a steering committee with a project coordinator. Engage local individuals interested in PV and CEPs. Introduce and promote the CEP to local authorities.
BG 02: Community assessment
Evaluate the purpose of the E.C. and its size to measure its potential impact. Identify the members of the community to understand its composition. Potential future members have to be considered as well.
BG 03: CEP Purpose and Vision Proposition
Definition of the purpose and vision of the CEP, including the outcomes, the overall benefit, and how the members will benefit from it. This very initial step makes sure that all participants share the same values and are on one page regarding the project concept.
BG 04: Environmental feasibility check
Check with normative base and local environmental institution (RIEW) whether the implementation of roof-top and stand-alone PV installation up to a certain plant size require an environmental impact assessment. The environmental assessment is necessary if your plant size exceeds 30 MW or if PV plant is freestanding object.
BG 06: Documentation and Approval - Technical projects
Prepare technical documentation for the PV plant/EC to apply for different permits, including: building permit, grid connection permit, etc.
BG 07: Analysis - Load bearing capacity for installation of PV systems
Determine whether the roof structure can bear additional load of PV installation and how big the load can be.
BG 05: Preliminary building permit for PV plants and direct power lines in urban environments
Obtain authorization by local authorities in order to construct PV plant and direct power lines.
BG 08-1: Analysis - Connection to the power grid for self consumption
Identify the nearest connection point to the grid with the DSO and check whether there are possibilities for augmentation of the feed in power. Check if there are any limitations on feed-in power, as well as the hardware requirements for connecting the PV system to the grid.
BG 08-2: Analysis - Power distribution cabinets
Assessment whether the existing power cabinets that service the building are sufficient to handle the current of the PV plant. Determine the ownership of power cabinets.
BG 09-2: Analysis - Free capacity of the feeder/low voltage grid connection line
Obtain information of the DSO free grid capacity to assess whether it will be possible to sell surplus energy to the electricity market.
BG 09-1: Analysis - Additional grid connections
For a CEP/EC with several buildings included and several direct power lines between the participants more than one grid connections with different characteristics maybe explored.
BG 09-3: Obtaining a Permit for connection to the grid
To build a PV plant first of all is necessary to obtain preliminary permit by the DSO, stating that connection to the grid in the area is possible and is generally available.