Catalogo dei servizi
166 servizi
AT: Registration - VAT Number
For energy communities whose turnover does not exceed 55,000 euros p.a., the tax exemption for small businesses applies. These entrepreneurs do not need to pay VAT to the tax office; however, they are not allowed to show VAT on invoices they issue.
AT: Billing - Monthly invoicing
Energy community operators have access to energy consumption and feed-in data of each member. This data needs to be transposed into an invoice. Invoices need to be send out periodically.
AT: Billing - Price Sheet
Costs for electricity consumption from the energy community need to be adjusted and communicated frequently.
BG 01: Community building
Create an initiative committee by experienced individuals. Organize a steering committee with a project coordinator. Engage local individuals interested in PV and CEPs. Introduce and promote the CEP to local authorities.
BG 02: Community assessment
Evaluate the purpose of the E.C. and its size to measure its potential impact. Identify the members of the community to understand its composition. Potential future members have to be considered as well.
BG 03: CEP Purpose and Vision Proposition
Definition of the purpose and vision of the CEP, including the outcomes, the overall benefit, and how the members will benefit from it. This very initial step makes sure that all participants share the same values and are on one page regarding the project concept.
BG 04: Environmental feasibility check
Check with normative base and local environmental institution (RIEW) whether the implementation of roof-top and stand-alone PV installation up to a certain plant size require an environmental impact assessment. The environmental assessment is necessary if your plant size exceeds 30 MW or if PV plant is freestanding object.
BG 06: Documentation and Approval - Technical projects
Prepare technical documentation for the PV plant/EC to apply for different permits, including: building permit, grid connection permit, etc.
BG 07: Analysis - Load bearing capacity for installation of PV systems
Determine whether the roof structure can bear additional load of PV installation and how big the load can be.
BG 05: Preliminary building permit for PV plants and direct power lines in urban environments
Obtain authorization by local authorities in order to construct PV plant and direct power lines.
BG 08-1: Analysis - Connection to the power grid for self consumption
Identify the nearest connection point to the grid with the DSO and check whether there are possibilities for augmentation of the feed in power. Check if there are any limitations on feed-in power, as well as the hardware requirements for connecting the PV system to the grid.
BG 08-2: Analysis - Power distribution cabinets
Assessment whether the existing power cabinets that service the building are sufficient to handle the current of the PV plant. Determine the ownership of power cabinets.
BG 09-2: Analysis - Free capacity of the feeder/low voltage grid connection line
Obtain information of the DSO free grid capacity to assess whether it will be possible to sell surplus energy to the electricity market.
BG 09-1: Analysis - Additional grid connections
For a CEP/EC with several buildings included and several direct power lines between the participants more than one grid connections with different characteristics maybe explored.
BG 09-3: Obtaining a Permit for connection to the grid
To build a PV plant first of all is necessary to obtain preliminary permit by the DSO, stating that connection to the grid in the area is possible and is generally available.
BG 10: Analysis - Consumption Profile
Find the consumption profile of the daily/monthly/annual routine of the EC buildings for the last three years.
BG 11: Contract - Sale of excess electric energy to the market
Identifying, contacting and negotiating favorable off-take terms with consumers in the vicinity of the EC. Provide expert knowledge to EC for understanding and finding a suitable contractual partner.
BG 12-1: Analysis - Roof areas, solar radiation and electricity yield profile
Evaluate the available area for panel placement, determine how much photovoltaic capacity can be accommodated, assess the possible solar yield at the EC location. Recommend high efficiency PV panels.
BG 12-2: Analysis - Size of PV installations, electricity storages, direct power lines
This step provides the initial project information about the size of the required energy equipment, i.e. PV installations, electricity storages, direct power lines and power grid connections.
BG 14-1: Analysis - Self energy consumption by CEP/EC participants
Use real and prognosis data for the last 3 years to match the electricity yield with the consumption profile of each of the CEP/EC participants.
BG 14-2: Key elements of economic and financial analysis and business plan
Evaluate the PV system to determine how much of the generated electricity can be used by the members of the EC and how much can be sold. Develop a business plan and a cash-flow analysis.
BG 14-3: Estimate - Costs
Estimate the costs related to the building of the PV installation, electricity battery storages, direct power lines between installations of participants in the CEPs/ECs.
BG 13: Financial concept
The feasibility of the technical solution is very much dependent on the possibility to finance the endeavor. Financial possibilities shall be assessed, consisting of own funding (equity), public funding and subsidies, as well as third party funding.
BG 15: Insurance
The planning of the PV system requires to understand all risks and costs associated with insurance. It is crucial to be adequately covered for potential issues such as equipment damage, theft, or liability.